My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
3500 - Local Oversight Program
>
PR0544235
>
ARCHIVED REPORTS XR0000998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:59:18 PM
Creation date
3/6/2019 3:22:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000998
RECORD_ID
PR0544235
PE
3529
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
02
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance/Quality Control Plan <br /> I'agc 9 <br /> Prior to arriving at the sample site, the drill ng/augers will be steam cleaned and all sample <br /> equipment will be cleaned Cleaning will be conducted on-site on all sampling equipment <br /> between each sample interval <br /> Soil samples will be obtained using a California modified split-spoon sampler containing three, <br /> six inch long, two inch diameter brass tubes The sampler will be driven 18 inches ahead of the <br /> hollow stem auger by a 140 pound hammer with a 30 inch drop in accordance with American <br /> Society for Testing and Materials (ASTM) Methods D 1586-84 for split barrel sampling of soil <br /> and D 1587-83 for thin-walled tube sampling of soils The blows required to drive the sampler <br /> each six inch interval will be recorded on the boring log The sampler will be removed from <br /> the boring and opened to reveal the brass tubes The bottom tube will be sealed with aluminum <br /> foil or teflon tape and plastic end caps, taped and labeled with the foIIowing information date, <br /> time, project ID, sample ID, name of sampler and type of analysis This sample will be <br /> immediately placed into a cooler containing dry ice or frozen chemical A 'high-low" <br /> temperature recording thermometer will accompany sample shipments to ensure proper <br /> temperature maintenance The samples will be delivered to a state certified laboratory <br /> following under chain-of-custody protocol within 48 hours of sampling, whenever possible <br /> Soil in the uppermost brass tube will be described according to ASTM standard practice for <br /> description and identification of soils (ASTM D-2488-84), Stratigraphic, genetic and other <br /> data/interpretations will also be recorded Soil properties may also be determined from the <br /> middle brass tube and from the sampler shoe. Alternatively the second sample tube may be used <br /> with the uppermost tube for preparation of duplicates These field observations will be noted <br /> on a log prepared for each bonng/well <br /> During sampling, latex gloves will be worn to prevent crass-contamination with other samples <br /> The disposable gloves will be discarded after collecting samples from each 18-inch sample drive <br />
The URL can be used to link to this page
Your browser does not support the video tag.