My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
3500 - Local Oversight Program
>
PR0544235
>
ARCHIVED REPORTS XR0000998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:59:18 PM
Creation date
3/6/2019 3:22:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000998
RECORD_ID
PR0544235
PE
3529
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
02
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance/Quality Control Pian Page 11 <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed with laboratory <br /> grade detergent, and nnsed twice with tap water, once with acetone, and once with deionized <br /> water This procedure will be carried out on-site before sampling of other monitoring wells, <br /> if more than one well is to be sampled with the same sampling device <br /> Immediately prior to sampling, the depth to water (DTW) in the well will be recorded The <br /> thickness of free phase LNAPL on top of the groundwater, if present, will be measured using <br /> an interface probe The procedure for monitoring is presented in Section 9 0 (Groundwater <br /> Moattoring Protocol) <br /> If free LNAPL is detected, analysts of groundwater at the interface for dissolved product will <br /> not be conducted A product sample will be collected for source identification, as needed if <br /> free product cannot be removed, an interval specific sampling device may be utilized to collect <br /> a sample from below the zone of free product. Before collecting groundwater samples from <br /> a well, the well will be purged until indicator parameters (temperature, conductivity and pH) <br /> stabilize This will entail the removal of at least four well casing volumes by baiting or <br /> pumping The criteria for determining well casing volumes and temporary stoiage of purged <br /> water is outlined in Section 10 0, (Well Development Protocol) The indicator parameter <br /> measurements will be taken both before and after purging of each well casing volume Once <br /> the well is purged and indicator parameters have stabilized, a sample will be collected after the <br /> water level approaches 80 percent of its initial elevation Where water level recovery is slow, <br /> the sample will be collected after stabilization is achieved and enough water is present to Sill <br /> sample containers <br /> Cross contamination from transfemng pumps (or bailers) from well to well will be avoided by <br /> Utilizing dedicated equipment Were this is not feasible, thorough cleaning of equipment will <br /> be performed between sampling rounds. Sampling will proceed from the least contaminated to <br /> 40 the most containinated well, if information is available before sample collection, or if it is <br />
The URL can be used to link to this page
Your browser does not support the video tag.