My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
3500 - Local Oversight Program
>
PR0544235
>
ARCHIVED REPORTS XR0000998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:59:18 PM
Creation date
3/6/2019 3:22:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000998
RECORD_ID
PR0544235
PE
3529
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
02
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance/Quality Control Plan <br /> Page 4 <br /> 5.3 DELIVERY OF SAMPLES TO LABORATORY <br /> Samples will be delivered to the laboratory on a daily basis. Samples will be refrigerated to <br /> approximately 4°C for shipping Shipping containers will be sealed with security tape to assure <br /> sample integrity during shipping Delivered samples will be accompanied by a chain-of-custody <br /> record The laboratory shall note on the chain-of-custody that samples were properly preserved <br /> and security tape was intact upon arrival <br /> G 0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION <br /> All equipment used for drilling and sampling will be decontaminated prior to use All equipment <br /> used for collection of more than one sample, such as bailers and spoons, will be decontaminated <br /> between each use to prevent cross contamination between samples Drilling equipment will be <br /> decontaminated prior to commencing drilling at each hole Well construction materials will be <br /> cleaned as necessary, prior to installation <br /> Equipment and well material decontamination will be conducted on an impermeable surface and <br /> all decontamination effluent will be contained All surfaces of the equipment will be thoroughly <br /> decontaminated using a steam cleaner The equipment will be placed on a drying rack for air <br /> drying The decontamination water will be stored in containers certified for hazardous materials <br /> storage and disposed of in an approved manner <br /> Sample equipment to be used for pesticides and organic analysis will be washed in a <br /> nonphosphate detergent (Alconox or equivalent) and nnsed with tap water, followed by <br /> deionized water and finally with acetone If the equipment is for ineWs analysis, the initial rinse <br /> will be conducted with 0 1 M nitric acid followed by tap water and deionized water <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br /> The following measuring equipment may be used during the Remedial Investigation Equipment <br /> is grouped by field activity Calibrationrocedure <br /> p sand frequency are listed for each piece <br />
The URL can be used to link to this page
Your browser does not support the video tag.