My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
3500 - Local Oversight Program
>
PR0544235
>
ARCHIVED REPORTS XR0001000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 7:11:40 PM
Creation date
3/6/2019 3:28:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001000
RECORD_ID
PR0544235
PE
3529
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
02
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLES <br />TABLE I RESULTS OF LABORATORY ANALYZES - WORK DONE BY <br />DEL -TECH, 1993 <br />TABLE II LAB ANALYZES OF SOIL SAMPLES FROM W/O TANK, <br />BTEX & TPH <br />TABLE III LAB ANALYZES OF SOIL SAMPLES FROM W/O TANK; <br />CAM -METALS <br />TABLE IV LAB ANALYZES OF SOIL SAMPLES FROM W/O TANK, <br />EPA 8010 <br />TABLE V LAB ANALYZES OF SOIL SAMPLES FROM W/O TANK, <br />EPA 8270 <br />TABLE VI LAB ANALYZES OF SOIL SAMPLES FROM DIESEL TANKS <br />TABLE VII LAB ANALYZES OF SOIL SAMPLES FROM DIESEL TANKS, <br />OVEREXCAVATIONS DONE 12/13 & 12/15/1994 <br />TABLE VIII LAB ANALYZES OF SOIL SAMPLES FROM MONITORING <br />WELLS #1, #2, #3, & #4 <br />TABLE IX LAB ANALYZES OF SOIL SAMPLES FROM AUGER HOLES <br />"A", "Bir, "C", & I'D" <br />TABLE X LAB RESULTS OF HYDROPUNCH WATER SAMPLES FROM <br />AUGER HOLES "A" & "B" <br />TABLE XI LAB ANALYZES OF WATER SAMPLES TAKEN 7/10/1995 <br />FROM MONITORING WELLS <br />APPENDIX <br />EXHIBIT A WJH WORKPLAN DATED 11/7/1994 <br />EXHIBIT B CORRESPONDENCE, CRWQCB, DATED 12/9/1994 <br />EXHIBIT C WJH WORKPLAN ADDENDUM DATED 2/7/1995 <br />EXHIBIT D RWQCB CORRESPONDENCE DATED 2/21/1995 <br />EXHIBIT E DEL -TECH FIELD REPORT COVERING MONITORING WELL <br />PURGING & SAMPLING DONE 7/10/1995 <br />EXHIBIT F PORTION OF SURVEYORS' MAP <br />EXHIBIT G LABORATORY REPORTS OF SOIL SAMPLE ANALYZES FROM <br />MONITORING WELLS <br />EXHIBIT H LABORATORY RESULTS OF SOIL SAMPLE ANALYZES FROM <br />AUGER HOLES <br />EXHIBIT I LABORATORY RESULTS OF HYDROPUNCH WATER SAMPLES <br />FROM AUGER HOLES "A" & "B" <br />EXHIBIT J LABORATORY RESULTS OF WATER SAMPLES FROM <br />MONITORING WELLS TAKEN 7/10/1995 <br />EXHIBIT K LABORATORY RESULTS OF SOIL & WATER SAMPLES TAKEN <br />AFTER REMOVAL OF CLAY PIPE AT WEST SIDE OF SITE <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.