My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
3500 - Local Oversight Program
>
PR0544235
>
ARCHIVED REPORTS XR0001005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 7:12:43 PM
Creation date
3/6/2019 3:32:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001005
RECORD_ID
PR0544235
PE
3529
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
02
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by retrieving samples from the appropriate areas with the <br /> excavator bucket Samples will be taken from the bucket by <br /> GeoAnalytical Laboratories representative on site All <br /> sampling and analyses will follow LUFT guidelines . Samples <br /> will be transported by the GeoAnalytical representative <br /> directly to their Laboratories, located in Modesto, CA under <br /> chain of custody. Samples will be tested for TPH-D, K, M.O. <br /> and BTE & X We propose to take 4 sidewall and 3 bottom <br /> samples from the tank excavation and 4 along the bottom of <br /> the pipeline excavation. Samples will be taken equidistant <br /> around the perimeter and along the length of the bottom of <br /> the excavations [see attached drawing] Locations of the <br /> samples may change at the direction of SJHS/EHD <br /> representative on site We propose 4 samples (8 discrete to <br /> form the 4 composites) from the spoil pale at the direction <br /> of the SJPHS/EHD representative . The total number of samples <br /> may be altered of conditions or volumes warrant a change <br /> 8 . Temporary Fence A temporary fence has been placed <br /> around the excavation and will remain in place until it as <br /> backfilled. <br /> 9 Backfill Backfilling will be done by Jam <br /> • Thorpe Oil personel . Backfill material will be whichever is <br /> appropriate for the desired final condition <br /> 10 Work Schedule Work can begin within 14 days of <br /> SJPHS/EHD approval of this work plan. Sample analyses <br /> results should be ready for review within 2 weeks <br /> 11 Health and Safety Plan Attached <br /> Respectfully submitted, <br /> 0R_ PE OIL, INC. <br /> R - STRUCTION <br /> R chard Tho pe <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.