Laserfiche WebLink
by retrieving samples from the appropriate areas with the <br /> excavator bucket Samples will be taken from the bucket by <br /> GeoAnalytical Laboratories representative on site All <br /> sampling and analyses will follow LUFT guidelines . Samples <br /> will be transported by the GeoAnalytical representative <br /> directly to their Laboratories, located in Modesto, CA under <br /> chain of custody. Samples will be tested for TPH-D, K, M.O. <br /> and BTE & X We propose to take 4 sidewall and 3 bottom <br /> samples from the tank excavation and 4 along the bottom of <br /> the pipeline excavation. Samples will be taken equidistant <br /> around the perimeter and along the length of the bottom of <br /> the excavations [see attached drawing] Locations of the <br /> samples may change at the direction of SJHS/EHD <br /> representative on site We propose 4 samples (8 discrete to <br /> form the 4 composites) from the spoil pale at the direction <br /> of the SJPHS/EHD representative . The total number of samples <br /> may be altered of conditions or volumes warrant a change <br /> 8 . Temporary Fence A temporary fence has been placed <br /> around the excavation and will remain in place until it as <br /> backfilled. <br /> 9 Backfill Backfilling will be done by Jam <br /> • Thorpe Oil personel . Backfill material will be whichever is <br /> appropriate for the desired final condition <br /> 10 Work Schedule Work can begin within 14 days of <br /> SJPHS/EHD approval of this work plan. Sample analyses <br /> results should be ready for review within 2 weeks <br /> 11 Health and Safety Plan Attached <br /> Respectfully submitted, <br /> 0R_ PE OIL, INC. <br /> R - STRUCTION <br /> R chard Tho pe <br /> President <br />