Laserfiche WebLink
• Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Ezaria Nona [EzariaN@gtienv.com] <br /> Sent: Monday, October 03, 2011 3:35 PM <br /> To: Mike Infurna [EH] <br /> Cc: Jenny Weese; Ray Kablanow <br /> Subject: JM Equipment-Project Status Report <br /> Mr. Infurna, <br /> Per our phone conversation dated September 27, 2011, 1 have drafted a project status report detailing the Phase <br /> I pilot test at the 1M Equipment site located at 1245 W Charter Way,Stockton, CA. <br /> • Performed baseline groundwater sampling of selected monitoring and observation wells on 9/29/11 <br /> • Installed ORC Advanced Socks, enabled the air sparge system and performed the ist of 8 weekly <br /> hydrogen peroxide injection events on 9/30/11 <br /> • Will conduct 7 additional weekly hydrogen peroxide injections events,followed by 16 additional bi- <br /> weekly hydrogen peroxide injections. Bi-weekly hydrogen peroxide injection events are tentatively <br /> scheduled to begin on 12/2/2011. <br /> • Will perform the 1st month of post-pilot test groundwater sampling on October 31, 2011. The 2nd <br /> sampling event will be conducted quarterly if no impacts at 1st event, then semi-annually if no impacts <br /> at 2nd event. Note—this is per the N01 MRP issued by the RB. <br /> • Will perform the 4th Quarter Groundwater Monitoring Event on 11/10/2011 <br /> • Will review all groundwater data by March 2012 in an attempt of selecting the most appropriate <br /> remedial technology and completing the RAP addendum before the end of the fiscal year. <br /> Please let me know if you need any additional information. <br /> Thank you, <br /> Ezaria Nona, B.S. <br /> Geology <br /> to <br /> Geological Technics Inc. <br /> 1172 Kansas Avenue <br /> Modesto, CA 95351 <br /> 209-522-4119 - phone <br /> 209-522-4227 - fax <br /> ezorion@gtienv.com <br /> Web Site: gtienv.com <br /> 10/3/2011 <br />