My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> C,eologiedl Tec/mics Inc. <br /> 1172 Kansas Avenue <br /> Modesto,California 95351 <br /> (209)5224119/ Fax#522-4227 <br /> July 13,2009 <br /> Project No.: 507.2 <br /> Project Name: J.M. Equip. (Charter Way) <br /> Mr. Michael Infurna <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> Stockton CA 95202-3029 <br /> RE: Site Conceptual Model &Feasibility Study Extension Request <br /> J.M.Equipment, 1245 W. Charter Way, Stockton,CA <br /> Dear Mr. lnfurna: <br /> Geological Technics Inc. (GTI) has performed the field work portion of the Additional Site <br /> Characterization Work Plan that was approved by your correspondence of May 12, 2009. The approval <br /> letter requires that the updated site conceptual model (SCM) be uploaded to Geotracker within 60 days <br /> of the last Geoprobe boring installation. The letter also directs that an updated feasibility study be <br /> included with the SCM. <br /> On behalf of J.M. Equipment, we respectfully request that the SCM and Feasibility Study submittal date <br /> be extended until August 29,2009, with the understanding that we will be moving forward to implement <br /> the work as quickly as possible once we have client approval. <br /> Please do not hesitate to call if you have questions or need clarification. <br /> Respectfully Submitted, <br /> Tamorah Bryant, P.E. <br /> cc: Catherine Kahler <br /> USTCFP <br /> 5072 SJC ext request Itr 090713.doc I of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.