Laserfiche WebLink
02/22/2008 09: 56 2095224227 GEOLOGICAL TECHNICS PAGE 01/02 <br /> ii <br /> FJA x <br /> �i <br /> T It A N M I T T A I <br /> FROM: Elizabeth Emmons,Executive A istant Cieotogkat rechaks 14a <br /> DATE: 2/22/2008 11017th Street (office) <br /> Modesto,CA 95354 <br /> TIME: 10:00 a.m. <br /> Phone: 209/522-4119 <br /> #Pages: 2 (including this page) <br /> Fax: 209/522-4227 <br /> X Fax only <br /> Original to follow in mail <br /> g RSC& r <br /> TO: JM Equipment — Catherinekahler F <br /> Mike Infurna EB 2 2 2008 <br /> tV <br /> Ery RO ui4 COl1Nn, <br /> Fax#: 209-522-5980 1-7-H <br /> T H p PAR MENT <br /> 209-468-3433 <br /> MESSAGE: <br /> The following drilling schedule pertains to the JN Equipment/Geo Corp <br /> Site located at: <br /> 1245 W. Charter Way <br /> Stockton, CA <br /> Site Code: 1230 <br /> RO#: 297 <br /> CUF#: 12607 <br /> DRMLTNfz DATES: <br /> February 28, 2008-Installation of two Geoprobe9`SGP-4 & GP-5) <br /> Project Geologist: Joe Angulo &Tamorah Brye6t, Geological"Technics <br /> Contact Ntunber: 209-522-4119 <br /> Permits: San Joaquin County: SRO 053373 <br /> Start Time: 8 a.m. <br /> Workelans/Feasibility Studies: October 1, 200, <br /> Please call if you have any questions. Please see attached map for well locations. <br /> Please Note: The information contained in this facsitnilaj message may be privileged or confidential, and is intended only <br /> for the use of the individual named above and others who have been specifically authorized to receive it. If you are not the <br /> intended recipient, you are hereby notified that any disscnrjination, distribution, or copying of this communication is hereby <br /> strictly prohibited. If you have received this communicailon in error, or if any problems occur with transmission, please <br /> notify us immediately by telephone. <br />