My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Thursday, February 14, 2008 10:13 AM <br /> To: 'RKablanow@geologicaltechnics.com' <br /> Cc: Iray.gti@sbcglobal.net' <br /> Subject: JM Equip <br /> Ray, <br /> I'm starting to process the permit application you sent in for the two Geoprobes borings at this site and I'm <br /> unhappy with the status of the site. <br /> In reviewing the file, I noticed that in our Oct 17, 2007 letter to JM, the EHD required re-estimated mass <br /> calculations to be in an updated SCM due at EHD by Jan 18, 2008. The SCM is not here or on Geotracker. NO <br /> mention of it was made in the 4th QMR I just received on Geotracker today. <br /> Additionally, you're late on submitting this application and late for the field work phase for these borings as noted <br /> in your schedule in the work plan. Looks like the report due in Feb 2008 will be late too. <br /> I've been patient with this site, but you've exhausted my ability to tolerate the delays. <br /> I'll issue the permit today. <br /> Schedule the work for THIS MONTH. Call/email me with 2-working days notice of the date the drilling will start. <br /> THe report of findings for this phase, in updated SCM format, is to include revised mass calculations as per EHD <br /> requirements and is to be ON GEOTRACKER so that it is available for EHD review on April 1, 2008. <br /> if you consider this notice as not sufficient to relay my intent,just let me know today. I will gladly put it in formal <br /> correspondence to the RP and the CUF with the notatation that the SCM is due immediately(Feb 22)and that <br /> sites/RPs are required to be in compliance with directives issued by the EHD. As of today, the site/RP is not. <br /> I'll start the letter tomorrow if I don't hear from you today. <br /> Michael J. Infurna Jr. <br /> Senior REHS. <br /> LOP/Site Mitigation Unit IV <br /> San Joaquin County Environmental <br /> Health Department (EHD) <br /> 600 E. Main Street <br /> Stockton, CA. 95202-3029 <br /> office: (209)468-3454 <br /> pager: (209)982-8771 <br /> email: minfurna@sjgehd.com <br /> 2/19/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.