Laserfiche WebLink
GeolagicalTec/rKics/ru. <br /> ' J.M.Equipment Co.,Inc. <br /> Project No.:507.2 <br /> July 29,2005 Page 2 <br /> ' acceptable to determi a if . . <br /> the proposed injection would cause deleterious effects to <br /> groundwater. I dire ed that a work plan for the bench scale pilot test be submitted for <br /> his review. GTI then ntacted SECOR for <br /> Inc. (SECOR) that can <br /> require bench test and r quested a work plan to meet the RW <br /> proposed SECOR work lan is attached for the RWQCB-CVR review. perform the <br /> ' QCB-CVR requirements. The <br /> Pending regulatory app oval of the SECOR work plan,budget for the installatio of the three soil borings as approved' GTI will proceed to develop a <br /> budget will include theSECOR bench test and the sso ated a SIC HS/E and The <br /> sampling required to Provide test materials. <br /> ' If you have any questions please do not hesitate to can me at (209) 522-4119. <br /> 2 4119. <br /> ' Respectfully submitted, <br /> RayKablanow 11, P .D <br />' Vice President <br />' cc: James Barton -RW CB-CVR <br /> Mike Info na- SIC HS/EHD <br />' USTCFP <br />