My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Geological ChA '* s 19C- <br /> 110 1 7"S reet <br /> Modesto,Califo is 95354 <br /> (209)522-4119/Fax A 522-4227 <br /> August 25, 2003 <br /> via fax: (916) 777-4101 <br /> Project No. 507 <br /> Project Name: Geo Corp. (W. Charter Way) <br /> Robert Vickery <br /> V& lling <br /> P.O. Box <br /> Rio Vista, CA 4571 <br /> RE: Job Quote - Ge -Probe Drilling <br /> Location—JM quipment Company, 1245 West Charter Way, Stockton, CA. <br /> Dear Mr kery, <br /> We will be installing three 1" PVC monitoring wells to test groundwater after we inject <br /> hydrogen peroxide int the subsurface. Geological Technics Inc. requests a cost quote for the <br /> following geo-probed 'lling work: <br /> 1. Drill and install e (3) geo-probe boreholes (2.5 inch diameter) to a depth of 30 feet. <br /> 2. Collect a maximu of four (4) soil samples for laboratory analysis (no geologic logging). <br /> 3. Surge& develop tl a wells (1", PVC) after installation. <br /> 4. Include caps & ace tate sleeves in your estimate. <br /> Construction details: <br /> eo. a. Green of an ac rans. ea on ea <br /> tsan "J'-surface <br /> san -sur ace <br /> san - - -sur ace <br /> Please fax me your est mate. <br /> Respectfully, <br /> GE OGYCgL C CS z91[C. <br /> Jose�ulo^ <br /> P g <br />
The URL can be used to link to this page
Your browser does not support the video tag.