Laserfiche WebLink
01/29/2004 13:07 2095224 " GEOLOGICAL TECHS PAGE 01/02 <br /> fix <br /> r a A N 5 M / r T A L <br /> FROM: Jenny Weese Office Manager C,eologcCal7OChX CS IKC. <br /> DATE: January 29,200 t 1101 7th Street (office) <br /> Modesto,CA 95354 <br /> TIME: 1 P.M. <br /> Phone: 209/522-4119 <br /> # Pages: 2 (including is page) <br /> Fax: 209/522-4227 <br /> X Fax only <br /> Original to follow [nail <br /> TO: JM Equil nt — Catherine Kahaer <br /> Mike Infurnp <br /> Fax#: 209-522-5980 1 <br /> 209-468-3433 <br /> MESSAGE: <br /> The following drilling schedule pertains to the JM Equipment/Geo Corp Site located at: <br /> 1245 W. Charter Way <br /> Stockton, CA <br /> Site Code: 1230 <br /> RO#: 297 <br /> CUP#: 12607 <br /> DRILLING DATES: <br /> February 5, 2004 —Install tion of 3 monitoring wells <br /> Project Geologist: Joe Angulo, Geological Technics <br /> Contact Number: 209-522-4119 <br /> Permits: San Joaquin County: Mailed to Mike Infuma with check on January 7, 2004 <br /> Start Time: 8 a.m. <br /> Work Taus/Feasibili S dies: June 10, 2003, 9-20-02, and 1-15-03 <br /> Please call if you have any questions. Please see attached map for well locations. <br /> Please Note: The informatior contained in this facsimile message may be privileged or confidential, and is intended only <br /> for the use of the individual named above and others who have been specifically authorized to receive it. If you are not the <br /> intended recipient,you are hereby notified that any dissemination, distribution, or copying of this communication is hereby <br /> strictly prohibited. If you have received this communication in error, or if any problems occur with transmission, please <br /> notify us immediately by teleph ne. <br />