My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Te hnics Inc. <br /> 2741 Riv r Rwd <br /> ,Modesto,Cafifm 351 <br /> (209)538- 4241Far#5 -5852 <br /> �n <br /> December 4, 2000 <br /> Project No.: 507. F <br /> Project Name: Geo orp. (Charter Way) <br /> Ms. Linda Sanborn <br /> State Water Resources ontrol Board <br /> 2014 T Street, Suite 13 <br /> P.O. Box 944212 <br /> Sacramento, CA 9424 -2120 <br /> RE: Cost Pre-Appr al: Monitoring Well Installation <br /> Location: 1245 West Charter Way, Stockton, CA 95206-1108 <br /> County Site Co e: 9401; USTCFP Claim#012607 <br /> Dear Ms. Sanborn: <br /> In his facsimile con pondence dated November 16, 2000, Mike Inferna of SJCPHS-EHD <br /> approved our Noven her 6, 2000 for subsurface investigation work at the above site. <br /> Geological Technics I c. (GTI) proposes to install three additional monitoring wells and one <br /> soil boring to further fine the extent of the gasoline plume. <br /> On behalf of the Geo Corp., GTI has prepared the following Cost Pre-Approval for the attached <br /> Work Plan dated November 6, 2000 for three additional monitoring wells and one soil boring. <br /> The following support ng documents are attached: <br /> ■ Work Plan <br /> ■ Itemized spread sleet of costs for performing this work <br /> ■ San Joaquin County correspondence <br /> Thank you for your attention to this project. Call me if you have questions or need <br /> clarification. My pho e number is (209) 538-6424. <br /> Respectfully Submitt , <br /> 7 'J + ff4,7 <br /> - <br /> Geo(ogica(Technics Inc. <br /> Raynold 1. Kablanow 11, Ph.D. <br /> Vice President <br /> cc: Nancy Nelson Geo Corp <br /> Marty Hartzell —CRWQCB-CVR <br /> Mike Infurna SJCPHS-EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.