Laserfiche WebLink
Geofogica(TecAnics Inc. <br /> 2741 Riiv Rwd <br /> Moles%C.Af.9535 <br /> (209)538-64241Fa,#538-5 2 <br /> November 22, 1999 <br /> Project No.: 507.2 <br /> Project Name: JM Equi ment(Charter Way) <br /> Ms.Linda Sanborn <br /> State Water Resources Contrc I Board <br /> 2014 T Street, Suite 130 <br /> P.O.Box 944212 <br /> Sacramento,CA 94244-212 <br /> RE: Cost Pre-Approval— ell Head Maintenance&Repair <br /> Location: JM Equil ment Company, 1245 West Charter Way, Stockton, CA <br /> County Site Code: 9 lO1; USTCFP Claim#012607 <br /> Dear Ms. Sanborn <br /> On behalf of JM Equipment Company, I have prepared the following Cost Pre-Approval package for the <br /> following work: <br /> ❑ Remove and replace two well boxes of wells obtained through ownership transfer from Independent <br /> Trucking(the property ac joining the subject property to the east). <br /> Following the instruction of the County and the CRWQCB, JM Equipment became owner of 5 wells that <br /> Independent Trucking installed during their process of investigating the extent of their contamination. These <br /> wells are shown on the attac d site map and are: MW-I,2, 3, 8, &9. The ownership transfer documents are <br /> attached. <br /> Two of the well boxes of the former Independent Trucking wells were damaged and so need to be repaired to <br /> protect groundwater from bei ig cross contaminated. That is the purpose of this proposal. <br /> Proposed Bidding of Pro'e <br /> The budget-spread sheet is a tached and shows itemized costs for the proposed tasks. In an attempt to make <br /> this Pre-Approval flow smo thly, we have used the same unit costs for this work that has previously been <br /> approved by the USTCFP foi other projects. <br /> Geological Technics Inc.acci pts field support services and lab invoices and adds a 15%overhead fee. <br /> Tentative Schedule for Imn ententine Work <br /> Task Description Schedule <br /> • Receive approval of Cosi s from USTCFP Dec 10, 1999 <br /> • Perform Well Head RepE it work Dec 20, 1999 <br /> • Perform Fall Quarterly roundwater Monitoring Dec 20, 1999 <br /> Thank you for your attentio to this roject. Call me if you have questions or need clarification. Respectfully <br /> Sub <br /> . I} <br /> CGeofogicaf7echaics Inc. <br /> Raynold I.Kablanow II <br /> cc: Ms.Nancy Nelson- JM Equipment <br /> Mike Infuma-Cour ty <br />