Laserfiche WebLink
f d� • <br /> State ater Resources Control Board <br /> Division of Clean Water Programs <br /> Winston H.Hickox 2014 T Street•Sacramento,California 95814•(916)2274336 �. <br /> Secreta or <br /> Ma ing Address: P.O.Box 944212•Sacramento,California•94244-2120 Gray Davis <br /> Environmental FAX(9 6)227-4530•Interne[Address: http://wwwswrcb.ca.gov/=cwphome/ustcf ��., Governor <br /> Protection <br /> June 25, 1999 <br /> Nancy Nelson <br /> JM Equipment Co., Inc. <br /> 819 9th St S <br /> Modesto, CA 95351 <br /> PRE-APPROVAL OFC RRECTIVE ACTION COSTS, CLAIM NO. 012607, <br /> SITE ADDRESS: 1245 CHARTER WAY W, STOCKTON, CA 95206 <br /> I have reviewed your req est, received on June 24, 1999, for pre-approval of corrective action <br /> costs; I will place these documents in your file for future reference. I have included a copy of the <br /> "Cost Pre-Approval Reqi.est"form; please use this form in the future for requesting pre-approval <br /> of corrective actions cost . <br /> With the following provisions, the total cost pre-approved as eligible for reimbursement for <br /> completing the Geologic 1 Technics, Inc. soil cuttings & purge water disposal approved by the <br /> San Joaquin County EH (County) is $2,330.00; see the table below for a breakdown of costs. <br /> (The total amount appro d for payment through request number 1 for work at your site that has <br /> been directed and approv d by the County is $ 1,907.) <br /> Be aware that this pre-al roval does not constitute a decision on reimbursement: all <br /> reasonable and necessa corrective action costs for work directed and approved by the County <br /> will be eligible for reimb rsement per the terms of your Letter of Commitment at costs consistent <br /> with those pre-approved n this letter. <br /> Allfuture eostsj ir corrective action must be approved in writing by Fund staff. <br /> Future ct Pstsfior corrective action mass:meet the requirements o' <br /> Article 1j, Chapter 16, Underground Storage Tank Regulations. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> 210: Project Preparation 350.00 <br /> 240:Interim Site Work 1,775.00 <br /> 260: Lab Analysis 105.00 <br /> 270: Project Ma agemer t 100.00 <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />