Laserfiche WebLink
v � � <br /> State Water Resources Control Board10 <br /> Peter N1. Rooney John P. Caffrey, Chairman Pete Wilson <br /> Secrelan-Jor Governor <br /> Environmental Division of Clean Water Programs - <br /> Pro)ection '--014"I'Strect Suite 130•Sacramento,California 93814•(916)227.4411 FAX(916)''-27-4530 , <br /> M iling Address: P.O.Box 944212•Sacramento,California•94244-2120 <br /> Int met Address: http://www.swrcb.ca.gov/-ewphome/ustet`fundhome.htni <br /> NOV 20 1998 <br /> Nancy Nelson <br /> Jm Equipment Co., Inc. <br /> 8199th StS <br /> Modesto,CA 95351 <br /> UNDERGROUND STO GE TANK CLEANUP FUND, CLAIM NO. 12607, FOR SITE ADDRESS: <br /> 1245 CHARTER WAY W STOCKTON <br /> The State Water Resources Control Board(State Board) is able to issue,pursuant to applicable <br /> regulations,the enclosed L tter of Commitment(LOC) in an amount not to exceed$20,000. This LOC <br /> is based upon our review o the corrective action costs you reported to have incurred to date. The LOC <br /> may be modified by the SU to Board. <br /> It is very important that yo read the terms and conditions listed in the enclosed LOC. Claims filed with <br /> the Underground Storage nk Cleanup Fund far exceed the funding available and it is very important <br /> that you make use of the fu riding that has been committed to your cleanup in a timely manner. <br /> You are reminded that you must comply with all regulatory agency time schedules and requirements and <br /> you must obtain three bids for any required corrective action. Only corrective action costs required by <br /> the regulatory agency to pr tett human health, safety and the environment can be claimed for <br /> reimbursement. Unless wi ived in writing,you are required to obtain preapproval of costs for all <br /> future corrective action v ork(form enclosed). If you have any questions on obtaining preapproval of <br /> your costs or the three bid equirement,please call James Munch, our Technical Reviewer assigned to <br /> claims in your Region, at( 16) 227-4430. Failure to obtain preapproval of your future costs may result <br /> in the costs not being reim iursed. <br /> The following documents needed to submit your reimbursement request are enclosed: <br /> • "Reimbursement R equest Instructions" package. Retain this package for future <br /> reimbursement r quests. These instructions must be followed when seeking reimbursement for <br /> corrective action costs incurred after January 1, 1988. Included in the instruction package are <br /> samples of comple ed reimbursement request forms and spreadsheets. <br /> • 'Bid Summary Sht et" to list information on bids received which must be completed and <br /> returned. <br /> • "Reimbursement F equest" forms which you must use to request reimbursement of costs <br /> incurred. <br /> • "Spreadsheet" forr is which you must use in conjunction with your reimbursement request. <br /> California Environmental Protection Agency <br /> Qd Recycled Paper <br />