Laserfiche WebLink
v <br /> v State Water Resources Control Board <br /> John P. Caffrey, Chairman Pete Wilson <br /> Peter M. Rooney GoJernor <br /> .Seerelnn Jnr Division of Clean Water Programs - <br /> Environmental �pµ I'titrccl.Salle 130•Sacramento,California 95814•(916)227-4411 FAX(916)22 -4530 G ^ <br /> Pr°rection Tailing Address: P.O.Box 944212•Sacramento.California•94244-2120 <br /> Internet Address: http://www.swrcb.ca.gov/-cwphome/ustct%fundhome.htm <br /> NOV 20 1998 <br /> Nancy Nelson <br /> Jm Equipment Co., Inc. <br /> 8199th StS <br /> Modesto, CA 95351 <br /> UNDERGROUND STO GE TANK CLEANUP FUND, CLAIM NO. 12607, FOR SITE ADDRESS: <br /> 1245 CHARTER WAY W, STOCKTON <br /> The State Water Resources Control Board(State Board) is able to issue,pursuant to applicable <br /> regulations, the enclosed Letter of Commitment(LOC) in an amount not to exceed$20,000. This LOC <br /> is based upon our review o the corrective action costs you reported to have incurred to date. The LOC <br /> may be modified by the Sta te Board. <br /> It is very important that yox i read the terms and conditions listed in the enclosed LOC. Claims filed with <br /> the Underground Storage T ink Cleanup Fund far exceed the funding available and it is very important <br /> that you make use of the fii iding that has been committed to your cleanup in a timely manner. <br /> You are reminded that you must comply with all regulatory agency time schedules and requirements and <br /> you must obtain three bids i 7or any required corrective action. Only corrective action costs required by <br /> the regulatory agency to pr tett human health, safety and the environment can be claimed for <br /> reimbursement. Unless waived in writing,you are required to obtain preapproval of costs for all <br /> future corrective action work(form enclosed). If you have any questions on obtaining preapproval of <br /> your costs or the three bid i equirement,please call James Munch,our Technical Reviewer assigned to <br /> claims in your Region, at( 16)227-4430. Failure to obtain preapproval of your future costs may result <br /> in the costs not being reiml iursed. <br /> The following documents t eeded to submit your reimbursement request are enclosed: <br /> • "Reimbursement F equest Instructions" package. Retain this package for future <br /> reimbursement ri quests. These instructions must be followed when seeking reimbursement for <br /> corrective action costs incurred after January 1, 1988. Included in the instruction package are <br /> samples of comp/ ed reimbursement request forms and spreadsheets. <br /> • 'Bid Summary Sheet" to list information on bids received which must be completed and <br /> returned. <br /> • "Reimbursement I equest" forms which you must use to request reimbursement of costs <br /> incurred. <br /> • "Spreadsheet" fort is which you must use in conjunction with your reimbursement request. <br /> California Environmental Protection Agency <br />