My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
ARCHIVED REPORTS XR0001008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 7:50:27 PM
Creation date
3/6/2019 3:59:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001008
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cleologccaI rechnws Inc Page 3 <br /> Addendum-Feasibility Study <br /> Project No 507 2 <br /> January 15,2003 <br />' Table 2: Matrix of Oxidants, Reactions with MTBE (C5H,20) and Considerations for <br /> Use in the Field <br />' Oxidant& Reaction w/ Oxidant/MTBE OH Optimal EO Field <br /> MTBE (lb/lb) pH (V) Test <br /> H2O2 <br /> CsH120 + 15H2O2 (F") --� 5 811 3 - 5 1 78 <br /> 5CO2 + 21H2O <br /> ' 03 NA(3) ( ) 207 <br /> Mn04- <br /> 21MnO' + 2C5H120 --> 2 8/1 (2} 1 70 <br /> 21 Mn02 + 100O2 + 240H <br /> S208 _ NAP) 2 5 - 11 201 <br /> From July/August 2002 Contaminated Soil& Groundwatei,AEHS,2002 Oxygenated Fuel Issue <br /> (1) = If used with H2O2 of Fentons reagent 3 to 5 pH units otherwise increasing pH leads to <br /> faster ozone decomposition <br /> (2) = Three electrons are exchanged at a pH of 3 5 to 12 <br /> 1 <br /> 1.2 Proposed Plan <br /> As wero osed in the September 20, 2002 feasibility study work plan, we will be <br /> p p p <br /> performing a pilot test to fine-tune the infection process If this conceptual plan meets <br /> County and Regional Board approval, then GTI will prepare a work plan providing the <br /> details on the pilot test <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.