My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001036
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
ARCHIVED REPORTS XR0001036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:12:20 PM
Creation date
3/6/2019 4:14:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001036
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geofogica(Techn X' s Inc. <br />' 2741 River Road <br /> Modesto,CafZfornia 95351 <br /> (209)538-64241jax#598-5852 <br /> 1 <br /> Addendum #2 to January 17, 1997 <br /> Work Plan <br /> Soil Boring & Monitoring Well Installation <br />' J.M. Equipment Company <br /> 1245 West Charter Way <br />' Stockton, California <br /> Protect No 507 2 <br /> July 8, 1998 <br /> I <br /> 1.0 INTRODUCTION <br />' This addendum is in response to a phone conversation between Ray Kablanow and Mr Mike <br /> Infurna of San Joaquin County on ,lune 1, 1998 His comments were regarding the location <br /> and construction of the monitoring wells and the installation of vapor extraction wells to <br />' define the extent of soil contamination around the former tanks The work can be <br /> summarized as follows <br /> O Install three water table wells with screened intervals from 10 to 30 feet bgs <br /> IO The upgradient well will be moved closer to the source <br /> o Install a deep soil boring and collect discrete soil and water samples <br /> o Based on the soil boring data install a deep monitoring well with a discrete screen <br /> • Install only on vapor extraction well <br />' • Test for oxygenated fuel compounds <br /> I2.0 CHANGES TO PREVIOUS WORK PLAN <br /> See Figure 1 Site Map for the locations referenced in this addendum <br /> 2.1 Revised Monitoring Well Locations <br /> The location for monitoring well JM-1 will be moved to the northeast to place the up gradient <br /> Iwell closer to the source <br /> 2.2 Revised Construction of Water Table Monitoring Wells <br /> The current depth to groundwater is approximately 15 feet below ground surface The <br /> . construction of the three water table monitoring wells will be modified to accommodate the <br /> using water table at the site The screened interval will extend from 15 to 35 feet bgs <br />
The URL can be used to link to this page
Your browser does not support the video tag.