My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001036
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
ARCHIVED REPORTS XR0001036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:12:20 PM
Creation date
3/6/2019 4:14:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001036
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' §eofogtc dTechnus inc Page 4 <br /> J M Equipment Co <br /> Monitoring Well Installation Work Plan <br />' Appendix A <br /> Project No 507 2 <br /> January 13,1997 <br /> 1 <br />' center of the hollow stem augers and then the augers will be withdrawn from the hole The borehole annulus <br /> will be closed by pumping a neat cement grout(<4%bentonite/cement)through the tremie tube up to grade <br /> 29 Monitoring Well Construction <br /> The monitoring wells will be constructed with 4 0 inch diameter, schedule 40 PVC casing with flush threaded <br /> Joints A screened interval will consist of 0 020 inch perforations extending from approximately 15 feet below <br /> and 5 feet above the water table <br />' A number three sand will be used to form a filter pack about the saturated zone (0 020") perforations and will <br /> extend two feet above this screened interval An annular seal will be constructed by mstallmg 100 pounds of <br /> granular bentonite that will be hydrated with tap water and be allowed to expand for a period of one hour In <br />' the remaining annulus, neat cement grout will be installed using a slurry pump and tremae pipe <br /> The well will be secured with a water tight locking cap encased within a traffic safe well box A well <br /> construction schematic is attached as Figure 3 <br /> Relative well collar elevations may be surveyed by a competent surveyor <br /> 2 10 Monitoring Well Development <br /> Within 48 hours of well installation after well sealing materials have had time to set, each monitoring well will <br /> be developed by mechanical surging and pumping unto a clear stream is obtained All down hole equipment <br /> will be decontaminated before and between uses Development water will be removed from the well using <br /> either a bailer or a submersible pump and contamerized in D O T approved drums (labeled contents under <br /> analysis) to await proper disposition After development the wells will be allowed to stabilize before they are <br /> purged and sampled <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.