Laserfiche WebLink
CJeoCogical2echnw-s Inc 0 • Page 4 <br /> Geo Corp-WP Addendum 42 <br />' Protect 507 2 <br /> July 8, 1998 <br /> i <br />' 3.0 SCHEDULE & REPORTING <br />' Geological Technics Inc anticipates beginning field work no later than 30 days after work <br /> plan approval, issuance of the drilling permit and cost pre-approval The information <br /> gathered during this phase of work will be presented in a report which will include a <br /> summary of the geology as well as the results of sample analyses Dr Ray Kablanow, a <br />' registered professional geologist, will supervise the project Copies of the report will be <br /> forwarded to both the appropriate County and State regulatory agencies (SCEHD and <br /> CRWQCB-CVR) The three new monitoring wells and the existing MW-9 will be placed on <br />' a quarterly monitoring schedule A report of the data generated during each monitoring event <br /> will be prepared and submitted <br />' 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc in accordance with accepted <br />' geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br />' This work plan was prepared by <br /> G3eoCogtca(Technics Inc. <br /> Michael J Niemi <br /> Geologist <br /> Raynold I Kablanow II, Ph D <br /> California Registered Geologist #5234 <br /> Certified Hydrogeologist #442 <br /> I <br /> I <br />