My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001037
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
ARCHIVED REPORTS XR0001037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 8:10:15 PM
Creation date
3/6/2019 4:14:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001037
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qeologlca I recl�iics Inco <br /> 1101 7`"street <br /> Modesto,California 95354 <br /> ' (209)522-4119/Fax(209)522-4227 <br /> REPORT <br /> Groundwater Monitoring <br /> 3rd Quarter 2005 <br /> ' J.M. Equipment Company <br /> 1245 West Charter Way <br /> 1 Stockton, California <br /> Project No 507 2 <br /> ' October 31, 2005 <br /> EXECUTIVE SUMMARY <br /> ' This report summarizes the results of the 3`d Quarter 2005 groundwater monitoring and <br /> sampling event that took place on August 19, 2005 The average groundwater elevation at <br /> the site was —10 51 feet mean sea level (msl) and the groundwater flow was N4$°E at 0 003 <br /> 1 ft/ft for this event A vertical groundwater gradient calculation for wells MW-9 & 109 shows <br /> that groundwater is flowing downward at a slope of 0 0045 ft/ft <br /> ' The analytical results of groundwater samples show that detectable concentrations of gasoline <br /> range hydrocarbons were present in five of the site's groundwater monitoring wells for this <br /> event The magnitude of the contamination in the wells is consistent with historical site data <br /> The fuel oxygenate compound MTBE was detected in three monitoring wells <br /> Moderate to strongly negative Oxidation-Reduction Potential (ORP) measurements show that <br />' nine monitoring wells are within the halo of reaction depleted water caused by <br /> biodegradation of the contamination plume <br /> GTI submitted our June 10, 2003 "In-Situ Remediation Pilot Test" work plan for an in-situ <br /> hydrogen peroxide injection pilot test The SJC EHD issued approval of the work plan in <br /> their September 10, 2003 letter The injection process began on March 19, 2004 and a report <br /> on the pilot test was submitted to SJC EHD for review in November 2004 They have since <br /> commented on the field work and requested that a site conceptual model (SCM) be submitted <br /> prior to proposing further corrective action <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.