Laserfiche WebLink
1 <br /> Gtologual7erluiccslac Page 3 <br /> ' 3d Quarter 2005 Groundwater Monitoring Report <br /> Project No 507 2 <br /> . October 31, 2005 <br /> ' 10 in May 2001, the direction has been redorninantl to the northeast The site is quite close <br /> p Y <br /> to the San Joaquin River and tidal fluctuations may contribute to some of the observed <br /> changes in groundwater direction <br /> ' Vertical Groundwater Gradients <br /> Under vertical groundwater flow conditions, the water level in a monitoring well is a function <br /> of the length of the well screen and its depth or vertical position in the aquifer As with <br /> ' horizontal flow conditions, the diameter of the well or piezometer is immaterial <br /> The following procedure is used to calculate vertical groundwater gradient <br /> ' • Determine the vertical distance between the two measuring devices by the distance from <br /> the mrd-point between the top and bottom seal of the deep well (MW-109) and the mid- <br /> point between the groundwater elevation and the bottom seal in the shallow well (MW-9) <br /> ' • Measure the head in both wells used in the calculations <br /> • If the lateral distance between the well pair is greater than a few feet, then calculations <br /> must be made to correct the down-gradient piezometnc head to account for the sloping <br /> water table between the wells The calculation considers the slope of the water table and <br /> the distance in a down-gradient direction between the two wells used in the calculations <br /> Figure 2 shows the location of the well cluster used for calculating the vertical groundwater <br /> gradient in this report, MW-9 and MW-109 Table 1 shows Summary of Water Level and <br /> Gradients Slope and Bearing, and Table 2 shows the calculated vertical gradients The <br /> ' information used in the calculations is shown below <br /> ' Vertical gradient calculation formulas are as follows <br /> • Vertical correction for gradient [(gw gradient slope)x (distance) =vertical correction] <br /> • Vertical head [(head of deep well) - (head of shallow +correction) = vertical head] <br /> • Vertical gradient [(vertical head) / (vertical distance) = vertical gradient] <br /> For the August 19, 2005 monitoring event a vertical gradient was calculated for the MW- <br /> 9/MW-109 pair The vertical gradient was negative (a downward direction) at 0 0045 ft/ft, <br /> and this is consistent with the historical negative gradients at the site <br /> 1.2 Groundwater Sampling Procedure <br /> On August 19, 2005, Don Light of Del-Tech mobilized to the site to conduct groundwater <br /> ' monitoring of the site's eleven monitoring wells Before sampling was attempted, the wells <br /> were sounded for depth to water and then a clear disposable bailer was used to determine if <br /> floating product was present No free product was noted for this event, however, white <br />' foamy water was noted in MW-9 The wells were purged of at least three well volumes of <br /> stagnant water using a dedicated Waterra check-ball assembly and i/2 inch tubing or <br /> centrifugal pump Purging continued until the temperature, conductivity, and pH of the <br />