Laserfiche WebLink
' eo10 ua(Tec/intcs Inc e 5 Pa <br /> � B g <br /> Groundwater Mon,tonng Report <br /> Project No 507 2 <br /> l June 19, 2001 <br /> ' • <br /> Well,; MW-5, MW-6 and MW-9 contained 290, 5 1 and 400 ug/1 MTBE, respectively <br /> Wells MW-4, MW-5 and MW-9 contained 130, 450 and 400 ug/I TAME, respectively <br /> ' Gasoline oxygenates, DIPS, ETBE and TBA, are not present in any of the groundwater <br /> samples <br /> • The groundwater gradient is relatively flat and the direction of groundwater flow has <br /> vatted during the course of the investigation The site is quite close to the San Joaquin <br /> River and tidal fluctuations might be responsible for the observed changes in <br /> ' groundwater direction <br /> • Oxidation-Reduction Potential (ORP) was measured (Table 4) and the results suggests <br /> that all of the wells are either in the core of the contamination plume or are immediately <br /> ' down gradient of the plume and are within the halo of reaction depleted water caused by <br /> biodegradation of the contaminants <br /> ' The lateral extent of the contamination plume is defined to the east, northeast and southeast <br /> by wells MW-3, MW-2 and MW-1, respectively The plume is defined to the northwest and <br /> southwest by wells MW-10 and MW-7, respectively Figure 7 is a contour map indicating <br /> ' the wells' TPH-G concentrations on June 1, 2001 The vertical extent of the plume will be <br /> defined by MW-109 with additional monitoring <br /> 3.0 LIMITATIONS <br /> This report was prepared in accordance with the accepted standards and practices of the <br /> field of envitonmental geology, groundwater hydrology and good business practices It <br /> ' should be recognized that definition and evaluation of environmental conditions is a <br /> difficult and an inexact science Judgments leading to conclusions and recommendations <br /> are generally made with an incomplete knowledge of the site-specific conditions present <br /> ' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> ' made <br /> 1 <br />,1 <br />