Laserfiche WebLink
i� <br /> Advanced GeoEnvironmental, Inc. <br /> Site Health and Safety Plan <br /> Page 4 of 7 ; <br /> 6.0. ON-SITE WORK PLANS <br /> r <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> i` <br /> I� <br /> Project Team Leader: Task: <br /> Tim Cuellar Over site j <br /> Work Party#1: Task: �1 <br /> Geo Probe Operator Advance borings <br /> a Technician (if nee.) Clean equipment <br /> j <br /> I' <br /> The works party(ies)were briefed on the content of this plan1at the site on <br /> �i <br /> 7.0. COMMUNICATION PROCEDURES <br /> ISI <br /> i <br /> If hearing is impaired, the following standard hand signals will be used: <br /> i <br /> 3 <br /> Hand gripping throat: Out of air; can not breath <br /> Grip partner's wrist or both hands around waist: Leaves area immediately <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; Ilam alright; I understand <br /> Thumbs down: No; negative <br /> ;i <br /> I� <br /> i# <br /> i3 <br /> AGE-NC SHO/ver2.01reml3-96 ' <br /> a <br /> I� <br /> 1 <br />