Laserfiche WebLink
AMBRIA <br /> ANTICIPATED FIRST QUARTER 2005 ACTIVITIES <br /> Blaine will gauge and sample the site wells according to the existing sampling schedule and <br /> tabulate the data Cambria will prepare a groundwater monitoring report Cambria will prepare <br /> a report documenting site investigation activities conducted at the site during 2004 <br /> CLOSING <br /> If you have any questions regarding the contents of this document,please call Joe Neely at <br /> (707)933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> S., L' <br /> Susan Lukaszewicz <br /> Staff Geologist <br /> D GEO� <br /> VA W NF0 <br /> Joe W Neely, RG <br /> Senior Project Geologist <br /> RG 6927 ' No b927 <br /> r9�OF CA1.IF0� <br /> Attachments <br /> Figure 1 Well Survey Map <br /> Figure 2 Groundwater Contour/Chemical Concentration Map <br /> Appendix A Blaine Tech Services, Inc —Groundwater Monitoring Report <br /> cc Ms Karen Petryna, Shell Oil Products US <br /> Mr James Barton, Central Valley Regional Water Quality Control Board <br /> Mr Ahmad A]-Ruosan &Mr Ali Awnalah (property owners) <br /> 0854 2 <br />