Laserfiche WebLink
ui JI <br /> CAMBRIA <br /> California measured groundwater in wells MW-I through MW-5 <br /> at depths ranging from 41 16 to 42 58 fbg on January 22, 2003 <br /> Blaine's well gauging data is included in Appendix C <br /> Soil Types: Soil types encountered during drilling consisted predominantly <br /> of silt, clayey silt, sandy gravelly silt, and sandy silt (ML) to the <br /> total depth explored of 56 5 fbg Boring MW-4 contained a <br /> layer of silty sand (SM) from 50 to 50 5 fbg Soil types from the <br /> well borings are recorded on the boring logs (Appendix B) and <br /> on the Geological Cross Sections (Figures 4 and 5) <br /> Chemical Analyses. Selected soil and groundwater samples from the well borings <br /> were analyzed for total petroleum hydrocarbons as gasoline <br /> (TPHg), benzene, toluene, ethylbenzene, and xylenes (BTEX), <br /> and fuel oxygenates (methyl tertiary butyl ether [MTBE], <br /> di-isopropyl ether, tertiary amyl methyl ether, ethyl tertiary butyl <br /> ether, tertiary butyl alcohol, ethanol, and methanol) <br /> and lead scavengers (1,2-dichloroethane [1,2-DCA] and <br /> 1,2-dibromoethane [EDB])by EPA Method 8260B <br /> Soil Disposal Approximately 7 78 tons of soil were generated during field <br /> activities, stored onsite, and covered with plastic sheeting The <br /> soil stockpile was sampled and profiled for disposal <br /> (Appendix D) On January 13, 2003, Manley and Sons <br /> Trucking, Inc of Sacramento, California transported the soil to <br /> Allied Waste Industries' Forward Landfill in Manteca, <br /> California for disposal <br /> Well Materials Wells MW-1 through MW-5 were constructed using two-inch <br /> diameter, Schedule 40 PVC casing with a screen slot size of _ <br /> 0 020-inch and#2/12 Monterey sand <br /> Screened Interval: Wells MW-1 through MW-5 are screened from 38 to 53 fbg <br /> Monitoring well construction details are presented on Table 1 <br /> and recorded on the exploratory boring logs (Appendix B) <br /> Well Development/Sampling- Blaine developed and purged wells MW-1 through MW-5 on <br /> January 14, 2003 and sampled the wells on January 22, 2003 <br /> 1511 3 <br />