Laserfiche WebLink
And in addition <br /> d. Each person installing or testing any component must hold a certificate of <br /> training from the manufacturer of that component. <br /> 4. Any changes shall be submitted to SJC Environmental Health Department (EHD) <br /> for approval prior to commencing work. All new submittals supersede the <br /> previous ones. <br /> 5. All laboratory results for the samples must be forwarded to this office directly <br /> from the lab, to include dispenser samples,piping soil samples and dispenser& <br /> piping stockpiles samples (not indicated on your application, number to be <br /> determined by size of stockpile). <br /> 6. Owners and operators must use an underground storage tank system made of or <br /> lined with materials that are compatible with the substance stored in the <br /> underground storage tank system. <br /> 7. No gasoline, diesel, or other hazardous material or waste can enter the <br /> sewer/septic or storm water system. If it does it will be considered illegal <br /> hazardous waste disposal and enforcement actions could follow. <br /> 8. All personnel involved in the removal of the existing pipes must fulfill <br /> requirements of CCR, Title 8, Section 5192. <br /> 9. If any fuel is to remain in the underground storage tanks, they must be <br /> continuously monitored. <br /> 10. All piping, fittings, sumps and UDC's must be certified by an independent testing <br /> organization and labeled as required by the organization. (UL, ULC, ANSI, API, <br /> ASTM, etc., See California Code of Regulations, Title 23, Chapter 16 Table B for <br /> complete list.). Pursuant to the Underwriters Laboratories Inc (UL) listings, only <br /> those products bearing the UL mark will be considered listed. ANY <br /> PART/PRODUCT NOT MARKED WITH THE UL LABELOR ANOTHER <br /> LISTED TESTING ORGANIZATION WILL BE REJECTED. <br /> 11. All monitoring equipment used shall be listed in LG 113. <br /> 12. All installation and testing shall be in compliance with manufacturer's <br /> instructions, Section 2635 and 2636 of CCR. <br /> 13. All piping must slope and be able to drain to a containment sump with an <br /> audible/visual alarm. <br /> 14. All metal components in direct contact with the ground such as flexible <br /> connectors, swing joints, fittings, and pumps shall be cathodically protected. <br /> ✓15. An integrity test must be performed in accordance with the manufacturer's <br /> guidelines for the tank and the piping once the site is in operating condition(once <br /> concrete is poured) and before the final inspection. A hard copy of the results <br /> must be submitted to this office prior to operation. <br /> 46. Submit the Best Management Practices to EHD for managing fuel spills and wash <br /> down water at this site prior to the final inspection. <br /> 4/7. A"Certificate of Compliance for Underground Storage Tank Installation Form C" <br /> shall be submitted by the owner or the owner's agent before this installation will <br /> be considered complete by EHD. <br /> Submit Monitoring and Response plans to EHD prior to the final inspection. <br /> J9. Submit a completed Form B for the product change being made in the Northern <br /> most UST to EHD prior to the final inspection. <br />