Laserfiche WebLink
20. An accurate and drawn-to-scale-as-built plan must be received by EHD prior to <br /> scheduling the final inspection. <br /> 21. Contact Michelle Henry, REHS ay(209) 953-7699 for the following inspections: <br /> A. Piping removal and sampling <br /> B. Primary piping soap and pressure tests on vapor recovery and <br /> vent line piping <br /> C. Secondary piping soap and pressure tests on vapor recovery and <br /> vent line piping <br /> D. 24-Hour secondary containment lake test on all sumps and <br /> UDC's <br /> E. Visual inspection of piping to insure proper slope prior to <br /> covering <br /> F. Cathodic protection on metal components in direct contact with <br /> the ground if necessary <br /> G. Prior to operation, a complete functional test of tank and piping <br /> monitoring systems, i.e. a monitoring certification, as the Final <br /> Inspection. <br /> This permit expires 90 days from the approval date. A request for extension must be <br /> received 30 days prior to the expiration date. <br /> Please contact me at(209) 953-7699 with any questions regarding this permit. <br /> A <br /> , EHSunty EHD <br />