My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 7:03:51 PM
Creation date
3/7/2019 11:50:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page Z—of 8 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: Wank Manufacturer 0 Industry Standard 0 Professional Engineer <br /> /Other(Specify) <br /> Test Method Used: 0 Pressure 'kv,acuum 0 Hydrostatic <br /> 0 Other(peck) <br /> Test Equipment Used: v6e U Equipment Resolution: (t2- 3o <br /> X,)-)0 002- <br /> Tank# Tank# �L Tank#.3 <br /> �Tank <br /> Is Tank Exempt From Testing?' 0 Yes All No 0 Yes <No 0 Ye 0Yes DNo <br /> Tank Capacity: 6—t(Cr,,,,R0 6- C2. 66o GQ It&-" <br /> Tank Material: F;[Q-*q(&-55 F-1 e, 5 <br /> Tank Manufacturer: 1ovj 6UAtA 40 S <br /> Product Stored: <br /> Wait time between applying <br /> press �vacu ater and <br /> starting OF' � �0 LA-V- V- L&V <br /> Test Start Time: 3,- 30 3 0 3 ej <br /> Initial Reading(RI): —to (43 —to t±3 - —101+1 , <br /> Test End Time: 0"3(-) ka , 1 6 (()% 3 0 <br /> Final Reading(RF): —to W� —to Cif' —to <br /> Test Duration: 21,1 o v v V 2 L,,ery v S <br /> Change in Reading(RF-Rt): d) 4- H-9 <br /> Pass/Fail Threshold or Criteria: I\j u Le)55 o Lo s 5 i-*'A l p,jo Lo s s 'i V't <br /> Test Result: Pass 0 Fail Vass 0 Fail Pass IJ Fail 0/Pass. El Vail <br /> Was sensor removed for testing? 0 Yes o El NA []Yes Allo 0 NA El Yes ;Y\No El NA El es 0 No [NNA <br /> Was sensor properly replaced and 1 0 Yes 0 No /44NA 0 Yes 0 No ^A 11 Yes El No �1A /Yes 0 <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br /> testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.