Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ',/1Piping Manufacturer LlIndustry Standard ❑Professional Engineer <br /> ❑ ther(Spec f,) <br /> Test Method Used: Pressure 11 Vacuum El Hydrostatic <br /> ❑\Other(Spec) <br /> Test Equipment Used: erti5S a ve 6-uv t, -L✓, " hI Equipment Resolution: 5 `P-- <br /> Piping Run#s Piping Run#(o Piping Run# Piping Run# <br /> Piping Material: F c Sze /yrs �u �a 4' 5 '55 <br /> Piping Manufacturer: {tvGtQ.vUVI v►�(.✓Uh f� vL L,v <br /> Piping Diameter: r 3 <br /> Length of Piping Run: 7 rp P vV'/ v-u k, 701 <br /> Product Stored: �7 E+ ►a;./�lasFP U00- Ove Vfew5,aw?vo.,sh �k 14-Y V�-'A <br /> Method and location of Tr 5-4 boa+ cZ <br /> piping-run isolation: e! k,_ n <br /> a� ��..�--. box <br /> Wait time between applying <br /> 1ess acuum/water and <br /> 'sest: 1 a <br /> Test Start Time: cj '. I ' ZU ! 2-0 <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: �� !c t.� Gt.G u✓ Li_dlc <br /> Change in Reading(RF-Rj): f L SZ S 7-- <br /> Pass/Fail Threshold or <br /> Criteria: !'J0 LUSS i ALa s 5 I at 1)5 6�d Luss i r5�' <br /> Test Result: 2tEass ❑Fail ss ❑Fail ass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />