My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 7:03:51 PM
Creation date
3/7/2019 11:50:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page � Of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 Industry StandardPr ofessional Engineer <br /> o_ 0 Other(Spec) /11 <br /> Test Method Used: 0 Pressure 0 Vacuumdrostatic <br /> 0 Other(Spec) /Xly <br /> Test Equipment Used: r 0:FAJ e <br /> 4 t 4,W Equipment Resolution: <br /> 77-77777 <br /> UDC#I t UDC# 3 E UDC# J_ G. UDC# ZZ <br /> UDC Manufacturer: VCU U 13 V0,va li�>VOL_Vra <br /> UDC Material: & ee -m,r 4 1& <br /> SIS F;lit <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: t71 I <br /> Height from UDC Bottom to ►ju elf-0,V;tq e le c4--v i e-.ot 21uC-FVfea1 <br /> Lowest Electrical Penetration: 't)Uq,.lrV1,C4;k4-1 5 <br /> Condition of UDC prior to 0-e_.Lo <br /> testing: y f3 Y-tj <br /> Portion of UDC TestedLoct Ot I 4-eV t I <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> product and water)?* SfO- 10 M w ,-44-5 5--e- (-ot-M•W Ser?6WW!t * <br /> Turbine shutdown response time 5 Lp_e0m of.4,+5 s-d.j�- <br /> Is system programmed for fail- <br /> safe shutdown? ep0 No 0 �J <br /> NA , ea 0 No Q NA 0 Yes 0 No, 0 N4 0 Yes 0 No 0 <br /> ' .5 <br /> Of Ot-g_, <br /> Was fail-safe verified to be 0 Yes o DNA 0 Yes_Nt4o 0 NA 0 Yes ARZN <br /> oonal?* o. DNA 0 Yes S<4o DNA <br /> Wait time betweenI <br /> ,%ying <br /> pressure/vacuum/fate and <br /> starting test r-1",-v -5 IV t--t; -1-5 10/__1t_ftA44__T <br /> Test Start Time: 1 ( fob I : Is- <br /> Initial Reading(RI): ('r�5 Cn'Ll'2 �54 Gn-t te (a <br /> Test End Time: t 1 Z-0 /2- v CO) 1 s <br /> le, <br /> Final Reading(RF): F&15 Fe,-5 4-cfr(e r-rKs 6",0 <br /> Test Duration: cg D f>t Ft GK -e 5 <br /> ,0 Ty tKxx f r_5 <br /> Change in Reading(RF-R,): A-10 <br /> I <br /> Pass/Fail Threshold or Criteria: Dos 3v ovs 30A <br /> Test Result: P ass 0 Fail Pass 0 Fail ass 0 Failpass 0 Fail <br /> x_ <br /> Was sensor removed for testing? 0 Yes 0 No WNA 0 Yes 0 No )eNA O'S?6s Vo 0 NA DYes ON64NA <br /> Was sensor properly replaced and N 1 11 <br /> verified functional after testing? 0 Yes 0 No ANA 0 Yes 0 No SNA1 0 Yes ONo ^A 0 Yes 0 No)(NA <br /> Comments-(include information on rTaz airs made prior to testing, and recommended follow-upfor failed tests) <br /> I e <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.