My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 7:03:51 PM
Creation date
3/7/2019 11:50:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 8 of 8 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Faci.lity is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> fest Method Developed By: ❑ Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Meth J[used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resoluti <br /> Spi 1 Boz# Spill Boz# Sp943rox# Spill Bos# <br /> s Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): ^° <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading.(KF-RI): .., � <br /> Pass/Fail gresgold or <br /> Criteriaw <br /> TesfResult: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass: ❑Fail <br /> Comm is— include information on repairs made prior to testing, and recommendedfollow-up or ailed tests <br /> dl 0via- l t �aXis /;e —�s -e J w f4G� . �Z'Gcs/�rrr�r -. 7 f 6ed-i c4.� e, <br /> ^v <br />
The URL can be used to link to this page
Your browser does not support the video tag.