My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MELLON
>
800
>
2800 - Aboveground Petroleum Storage Program
>
PR0515468
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2021 8:26:53 AM
Creation date
3/8/2019 8:32:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515468
PE
2832
FACILITY_ID
FA0003691
FACILITY_NAME
MBM, Manteca
STREET_NUMBER
800
STREET_NAME
MELLON
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
800 MELLON AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it Manteca McLane <br /> 800 S. Mellon Ave <br /> Manteca Ca.95337 <br /> To San Joaquin, <br /> RtW' "ESkK Rut4xC"454 <br /> We are actively working on Items noted. Below is a detailed list of the status of completion regarding <br /> our inspection. Due to outsourcing of our equipment maintenance all oil containers are leaving our shop <br /> area. <br /> 9301 We are no longer using the 240-gallon tank in the shop area and have a meeting set up to remove <br /> the tank from the shop within days.The two 55-gallon drums will also be returned to a vendor.The <br /> SPCC plan is being adjusted to reflect that change. Updated SPCC plan will be presented to you <br /> promptly. <br /> 9603 The fuel tank for the backup generator was indicated as 500 gallons when in fact it is 250 gallons. <br /> The SPCC plan is being revised to reflect that change. <br /> •609 The SPCC plan is being revised to indicate Information and procedures to adequately report a <br /> discharge. Updated SPCC plan will be presented to you promptly. <br /> 0618 Third party Inspection Service maned Bagley has performed and will provide the periodic <br /> inspections to comply. I have attached a copy of that inspection. <br /> 9705 Storage containers are being removed from the center. Plan is being updated to reflect that <br /> change, Updated SPCC plan will be presented to you promptly. <br /> • 706 These containers will be leaving our shop area in the coming days. Updated SPCC plan will be <br /> presented to you promptly. <br /> •711 See the attached Inspection from Bagley. <br /> •726 We are installing overspill alarms in our tanks and I have attached a copy of the estimate to repair. <br /> I am attaching the estimate we are moving forward with. <br /> Thank you, <br /> i <br /> Mike Zim erman <br /> Manager of Transportation <br />
The URL can be used to link to this page
Your browser does not support the video tag.