My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MELLON
>
800
>
2800 - Aboveground Petroleum Storage Program
>
PR0515468
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2021 8:26:53 AM
Creation date
3/8/2019 8:32:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515468
PE
2832
FACILITY_ID
FA0003691
FACILITY_NAME
MBM, Manteca
STREET_NUMBER
800
STREET_NAME
MELLON
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
800 MELLON AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A O U I N Environmental Health Department <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facillly Name: FaMlily Address: pate: <br /> MBM, Manteca 8O0 MELLON AVE, MANTECA MIMI!06, 2019 <br /> Qualified Facility-Tier 11 <br /> 501 CFR 112.fi(aJ(1), Ter II Qualified Fealty Plan notcertified by the meneror a PE as eequlred IV v R o COS <br /> 112.6 bl <br /> 502 CFR 112.fi(b)(2) Tier 11 Qualified Facility Plan technical amendment not artlfie4"a Owner are PE IV vR oCOS <br /> 503 CFR 112.8(b)(3), Failure to have a PE cedRy in ending alternative measures for a Ter 11 Qualified Facility vV DR vCOS <br /> 112.6{b)t4) <br /> 504 CFR 112.6(b)(4)O Failure M surer to assure that a PE makes ell repaired abundances In a Ter II Plan IV nR vCOS <br /> General Requirements for SPCC Plan <br /> 601 CFR 1121 Failure of Plan RRI1111 basic requirements including a cross-referencing secket DV In v COS <br /> 602 CFR 112](a)(2) Plan Riled R discussequaskint environmental protection,Rappli®ble IV vR OCOS <br /> 603 CFR 112.7(a)(3) Failed to adequatelydevibe the physical layout line%Orly in the Plan •V OR vCOS <br /> 604 CFR 1123(e)(310t Plan failed to lncluda oil type and storage cepealy for each container IV DR vCOS <br /> 605 E)V(3)(Idthada <br /> (3)(iQ Plan felled to adequately discuss discharge prevention measures,g <br /> ne handling o V vR n COS <br /> 606 )(3)(iii) Plan nailed to adequately discuss foubly cringe Or drainage canvV vR oCOS <br /> 60] )(3)(iv) Plan fond Rnegate countermeasures for discharge discovery,reeanup IV DR vCOS <br /> 606 (3)(v) Plan Rlletl to actress tlisposal meNotlsfir rewveretl materials V vR v COS <br /> 609 (3vi), Plan failed to adequately contain procedures for reputing a tllxharge eV vR vCOS <br /> 610 CFR 112.7(a)(5) Discharge Procedures are not adequately addressed ifffe facility has no response plan vV OR vCOS <br /> 611 CFR 112.7(b) Plan railetl to include a description of potenllal equipment tallure or provide spurvalence o V IS v COS <br /> 612 CFR 1121(c) Plan failed to include secondary cantanmad,diversionary structures,Orequip to preyenl4iechaMe IV OR vGOS <br /> 613 CFR 1121(c) Failure to provide appropriate secondary containment,diversionary structures or equipment IV vR vCOS <br /> 614 CFR 1127(d) PE artMe4 Plan read to sarylaln immacfipbility Of aelainmenVdiversionar,s(mdures vV vR oCOS <br /> 615 CFR 11 27(d) Failure to perform integrity and leak learn,when claiming secondary containment impracticability IV vR vGOS <br /> 616 CFR 112.7(4)(1) Failure to prepare an oil spill contingency plan when chiming impracticability of atucWres IV DR vCOS <br /> 617 CFR 1127(d)(2) No written commitment olmanpaear,equipment,antl materials W carnal and remove oil discharge vV vR vCOS <br /> 816 CFR 112.](¢),112.9(,) Failed tokapreards of procetl <br /> e ums.inspection s,or integrity leafs for three years NV vR vCOS <br /> 819 CFR 1121(,(1) Failed to thin persvnnd On all discharge prevention details listed in this carton IV OR uCOS <br /> 620 CFR 112.7(1)(2) Failed to designate a person accourable for discharge prevention IV DR v COS <br /> 621 CFR 1121{)(1) Failure to include In the SPCC Pian a a accounts description ofemployeetalning uV vR vCOS <br /> 622 CFR 1121(1)(3) Failure to conduct Complete annual discharge preembon briefings for oil-hen4ling pemi IV DR v COS <br /> 823 CFR 1121(g) Man Palled to address securiy Msile and valves,Im*indent out,and lighting n V DR v COS <br /> 624 CFR 1121(g) Facility Riled to implement security Msife and valves,lack causing oM,and Iighding v V v R o COS <br /> 625 CFR 112.7(h) Plan Riled to adequaRy discuss fagiy tank car and hank truck badlng/unloading pact, IV vR vCOS <br /> 626 CFR 112.]@)(1) Loadingrunbeding mg,containment system not adequate to contain spill IV OR vCOS <br /> 627 CFR 112.7(h)(2) Failed to provide vehicular departure system for loading and unloading racks nV IS vCOS <br /> FA0003561 PR051eO a SCO01 Osaxem19 <br /> ..0.1 flea.P.2]Y1018 Page 2ef6 AbovepmWO Pare.Slcnge 110 in <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209468-3420 1 F 209 464-0138 wwuvsjcehg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.