Laserfiche WebLink
eBAGLEY ENTERPRISES, INC. <br /> LIQUID HANDLING SOLUTIONS <br /> IQ <br /> InspectionsDate: 31? 1 inspector Name: All C.Pfn Lac to l?paan Tank Number. �— <br /> Location: <br /> Annual Inspection Checklist <br /> General Impaction Information: <br /> ImPectien Guidance: <br /> D ForeWinnem not included In Mls Stada:d,follow the manufacturer recommended lmpanloMtesangashedules and procedures. <br /> D The pedodk AST lmpecuon is Intended for mortaring the eatenal AST condition and Its containment Muctura.This visual Inspection does <br /> not require a Certified Inspector.It shall be performed by an owners Inspector who Is familiar with the site and can Identify changes and <br /> developing problems. <br /> D Remove promptly upon dlscoearymnding water or liquid In the primary tank secodarycordenmeln area,Intents ,or split come, <br /> Before dbcharge M the environment,Impact the liquid ke-M.118ted protiums or other contamlmrm Intl disposed of N properly. <br /> Y In order to comply with EPA SPCC(Spill%events ,CMrolandCoumermeasure)rules,8 fadllty mud regularly tart liquid level wanl6 <br /> devices to emure proper operation(40 CFR 112.8(c)(8)(v)). <br /> Y (•l designates an Item In a non{omorm .stars.This Indicates that action is required to address a problem. <br /> ➢ Nonconforming nems lmonrtam lg link or MMI,m nt I to by require evaluation by an engineerexpedemxd In AST design,a Unified <br /> Inspector,or a tank manufacturer who will determine the Wrnnlve action.NOW the nonconformance and correawding corrective attlon In <br /> the comment section. <br /> D Retain the completed cheekiness for 36 months. <br /> ➢ Complete this checklist on an annual basis supplemental to the owner mon1M1,P.d1mud Inspection checklists. <br /> MM:N a flange hes ocwrrd to the tank system or containment that mry affect the SPCC plan,the condition should be evaluated against the <br /> 111"m Plan requirement by a Prole6610ne1 Engineer knowledgeable In SPCC development and hnplememallaa <br /> Itarri Task 9fabra Cca m erm <br /> 1.0 Tank CenWnMo. <br /> 1.1 ConhlnlneM Check for. <br /> structure • Holm or creokeM OVera•Qyu ONIA <br /> wnlalnmem wall orf cor <br /> • Washom <br /> • Lhler degradation <br /> Common <br /> • Lockage <br /> • Pelldfallum, <br /> • Tank aetilln <br /> oc <br /> 20 Tank Fnd" and Su parts <br /> 2.1 Foundation SsTWOMEM or nutriment mss, <br /> washout? <br /> 2.2 Cwcrele pad Cracking or spoiling? <br /> or ring well 0Ve8' 0EIWA <br /> 2.3 Supports Check for so, paint(allure, '{7q/Nf NAS riptt Clea vs <br /> SIM 0*.' No QUA S /tac 1N1( <br /> C2AvD <br /> 2.4 Water Water drains away rom}ank? LL CWD jr,RAJ <br /> drainage a•Qto QdIA <br /> 2.5 Tank Strep secured and in good <br /> grounding conditions,ONo CIWA <br /> AST INSPECTION STANDARD <br /> COPYRIGHT®2011 Steel Tank Institute <br />