Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: Ruvalcaba,Cesar <br /> Sent: Friday,July 5,2019 9:06 AM <br /> To: 'Michael Zimmerman' <br /> Cc: Manuel Ortega;Abel Martinez; Ethan Thompson <br /> Subject: RE: SPCC Manteca McLane - PR0515468 <br /> Attachments: SP001 6th eddion checklists (7).docx <br /> Michael, <br /> The latest return to compliance has been reviewed. Most of the violations will be addressed once the SPCC plan is <br /> received and reviewed.There are some questions that I have before I close some violations and I have some comments <br /> on others. <br /> The return to compliance states that violations 705 and 706 have been addressed. <br /> Violation 705 will need the SPCC plan submitted and should include a discussion on the container compatibility with the <br /> material stored.The SPCC plan did not include a discussion on that,as required by regulations. <br /> Violation 706—It's a bit difficult to confirm with the pictures but it seems that the four 55 gallon drums that were out in <br /> the yard,the 240 gallon used oil tank and the 55 gallon drum in the shop are now gone. If this is so please confirm this <br /> and the violation can be closed. <br /> Violation 618—Its stated that this was corrected by Gary Reeves Environmental.The violation is for the facility not <br /> having performed the monthly or yearly inspections required by the SPCC plan and the SP001 standard.You can provide <br /> a statement that addresses the monthly and annual inspections by the facility,as required by the plan and the standard, <br /> and the retention for the required amount of time. I have included the checklists that should be used for the <br /> inspections,they can be modified but the must remain substantially equivalent to the original checklists. <br /> Violation 603—The facility map does not contain the contents of each fixed container as required by regulation.The <br /> regulations also require the storage area where mobile or portable containers are located if there are any on site.This is <br /> what the regulations state to"Describe in your Plan the physical layout of the facility and include a facility diagram, <br /> which must mark the location and contents of each fixed oil storage container and the storage area where mobile or <br /> portable containers are located.The facility diagram must identify the location of and mark as "exempt"underground <br /> tanks that are otherwise exempted from the requirements of this part under§112.1(d)(4).The facility diagram must <br /> also include all transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise <br /> exempted from the requirements of this part under§112.1(d)(11)" <br /> The correction of the other violations will be verified once the SPCC plan is received. <br /> Violation#711 has been closed. Keep in mind that these are the requirements for the ST-001 inspection reports. <br /> In the final report,include field data,measurements,pictures,drawings,tables,and an inspection summary. In the <br /> summary,identify unacceptable conditions and recommended and/or mandatory corrective actions. Determine the <br /> suitability for continued service of the AST per Section 10.0 and document this in the final report. Include the date of the <br /> next scheduled FEI or FII,as applicable. Include the inspector's name and certification number in the report. <br /> 1 <br />