My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MELLON
>
800
>
2800 - Aboveground Petroleum Storage Program
>
PR0515468
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2021 8:26:53 AM
Creation date
3/8/2019 8:32:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515468
PE
2832
FACILITY_ID
FA0003691
FACILITY_NAME
MBM, Manteca
STREET_NUMBER
800
STREET_NAME
MELLON
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
800 MELLON AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No need to apologize tome. I am requesting apology for my misunderstanding. I am working with Gary. He stated that <br /> because our small tank is portable(moved by pallet)it does not need the required containment. It does however have <br /> containment reservoir underneath it.Also,we do not generate any more oil (or drums) as Penske and Ryder handle 100 <br /> percent of the maintenance. Gary stated he will reach out to you. Please call me if needed at 209-328-8593 as I search to <br /> be compliant as fast as possible. <br /> Thank you, <br /> Mike Zimmerman <br /> From: Ruvalcaba, Cesar<cruvalcabaPsigov.org> <br /> Sent Tuesday, October 1, 201911:12 AM <br /> To: Michael Zimmerman<Michael.ZimmemlanPMCLaneFS.com> <br /> Cc:Gary Reeves<garv@garyreeyesIIc.0rg> <br /> Subject: RE: McLane Trucking-PR0515468 <br /> ** STOP.THINK. External Email** <br /> Michael, <br /> My apologies for the late response. I was unexpectedly out of the office all of last week. <br /> Most of the violations have been addressed.There is one more violation from the original violations that has not been <br /> fully addressed. It seems like the plan writer has chosen to follow the STI SP-001 standard for inspections and testing. <br /> The Standard calls for monthly and annual inspections by the facility.The SPCC plan only calls for monthly <br /> inspections and does not mention the annual inspections.Attached are the SP-001 inspection checklists and below is <br /> the STI requirement. <br /> 6.5 The owner's inspector is to complete or update the STI SP001 Monthly Inspection Checklist or equivalent <br /> each month.Take note of instructions on the checklist. Note special conditions. <br /> 6.6 The owner's inspector is to complete the STI SP001 Annual Inspection Checklist or equivalent each year. <br /> Take note of instructions on the checklist. Note special conditions. <br /> 6.7 For portable containers, the owner's inspector is to complete only the STI SP001 Portable Container <br /> Monthly Inspection Checklist or equivalent each month. Take note of the instructions on the checklist. Note <br /> special conditions. <br /> There is a new in office violation that has been issued.The file titled"SPCC addendum 9-20-19" states that the 150 <br /> gallon portable#2 diesel fuel tank is maintained within the yard and has no secondary containment. It is unclear <br /> whether or not the 55 gallon drums have a prevention system that is in compliance with CFR 112.7(c)(see below)and <br /> will be verified during the next inspection.The 150 gallon container is clearly out of compliance and secondary <br /> containment must be provided as per regulations. <br /> CFR 112.8(c)(11) "Position or locate mobile or portable oil storage containers to prevent a discharge as described in <br /> §112.1(b). Except for mobile refuelers and other non-transportation-related tank trucks, you must furnish a <br /> secondary means of containment, such as a dike or catchment basin, sufficient to contain the capacity of the largest <br /> single compartment or container with sufficient freeboard to contain precipitation."Or as allowed by CFR 112.7(d). <br /> Here is some more on the appropriateness for secondary containment from the regulations <br /> CFR 112.7(c) Provide appropriate containment and/or diversionary structures or equipment to prevent a discharge <br /> as described in §112.1(b), except as provided in paragraph (k)of this section for qualified oil-filled operational <br /> equipment, and except as provided in §112.9(d)(3)for flowlines and intra-facility gathering lines at an oil production <br /> facility.The entire containment system, including walls and floor, must be capable of containing oil and must be <br /> constructed so that any discharge from a primary containment system, such as a tank,will not escape the <br /> containment system before cleanup occurs. In determining the method,design, and capacity for secondary <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.