My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2005
>
2900 - Site Mitigation Program
>
PR0535888
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2019 10:43:40 AM
Creation date
3/11/2019 9:50:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0535888
PE
2957
FACILITY_ID
FA0005277
FACILITY_NAME
A W HAYES
STREET_NUMBER
2005
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16331010
CURRENT_STATUS
01
SITE_LOCATION
2005 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report-Groundwater Inves..6ation <br /> First Student Bus Facility(Former A.W. Hayes Facility) <br /> 2005 Navy Drive—Stockton, CA <br /> The EHD has not received any reports of investigation for this Site since the installation <br /> and sampling of the four (4) monitoring wells was submitted in June 2004. As a result, <br /> the EHD requested the submittal of quarterly reports as required in the California Code of <br /> Regulations (CCR) Section 2652 (d), until a No Further Action (NFA) is issued by the <br /> lead regulatory agency. <br /> In October 2008, KR Environmental contacted the EHD regarding the future work <br /> required at the Site. The EHD informed KR Environmental that during an inspection of <br /> the Site, MW-2 could not be located. As such, the EHD requested KR Environmental to <br /> find the location of MW-2; re-develop the monitoring wells; sample the monitoring wells <br /> and have the samples analyzed for TPH-g, TPH-d and volatile organic compounds <br /> (VOCs); have the monitoring wells surveyed according to GeoTracker specifications; and <br /> submit all reports of work performed, all sampling data, site maps, etc. to GeoTracker as <br /> specified in the CCR Sections 3890 through 3894 for contaminated UST sites. <br /> 3.0 SCOPE OF WORK <br /> This groundwater investigation included conducting the following tasks: <br /> A. FINDING THE LOCATION OF MONITORING WELL MW-2 <br /> B. RE-DEVELOPMENT OF GROUNDWATER MONITORING WELLS <br /> C. SURVEYING OF GROUNDWATER MONITORING WELLS <br /> D. GROUNDWATER SAMPLE COLLECTION <br /> Groundwater Flow Direction and Gradient <br /> E. LABORATORY ANALYSIS OF GROUNDWATER SAMPLES <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.