Laserfiche WebLink
a� <br /> r,. <br /> ANIL <br /> RSA <br /> RSAnalysis 1414Brr <br /> Project Summary <br /> Date: 8/5/2016 <br /> Project: Lathrop Elementary Kitchen Modernization <br /> Job Number: 19767—C041 <br /> Technician: Jonathan Basden <br /> Scope of Work <br />' Final'Air Balance of the Kitchen Hood and Make-Up air. <br /> Observations & Outcomes <br /> Each system was balanced within design specifications without issues or concerns. The exhaust potion does not <br /> have grease filters by design therefore a traverse of this manor was not performed. <br /> The make-up air could be measured via flow hood therefore was also not traverse. The hood sheet indicated <br /> traverse measurements, although, and are only indicated to show the percentage relationship of each other by <br /> design. <br /> a <br /> I, <br /> i <br /> A <br /> 11 <br /> i I <br /> i <br /> i <br /> In our efforts to constantly improve in all aspects of our performance, we would appreciate any <br /> feedback,positive or negative, regarding your experience with the RSA team. <br /> Please click the link below to be directed to our Quality Assurance Survey. Thank you! <br /> RSA Quality Assurance <br /> 1035 Suncast Ln. Ste. 130 El Dorado Hills, CA 95762 Office 916.358.5672 <br />