My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BLACK DIAMOND
>
927
>
2800 - Aboveground Petroleum Storage Program
>
PR0515676
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2019 10:42:05 AM
Creation date
3/19/2019 4:18:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515676
PE
2832
FACILITY_ID
FA0003775
FACILITY_NAME
TIGER LINES INC
STREET_NUMBER
927
Direction
E
STREET_NAME
BLACK DIAMOND
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04903033
CURRENT_STATUS
01
SITE_LOCATION
927 E BLACK DIAMOND WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruvalcaba, Cesar <br /> From: Bob Buckley <bbuckley@wgr-sw.com> <br /> Sent: Thursday,April 25,2019 11:03 AM <br /> To: Ruvalcaba,Cesar <br /> Cc: Mark Handel <br /> Subject: Re: Tiger Lines: STI SP001 Inspection <br /> Hello Cesar, <br /> On behalf of Tiger Lines, I would like to report that the STI tank inspection for both 25K-gal,diesel tanks was <br /> completed today as planned. The certified inspector, Todd McWhorter, will prepare his report and present it to <br /> Tiger Lines when completed. The report will be included with the SPCC Plan once he sends it to me. <br /> Thank you, <br /> Bob <br /> Bob Buckley <br /> Senior Compliance Specialist <br /> WGR Southwest,Inc. <br /> 11780 N.Hwy.99 <br /> Lodi,CA 95240 <br /> (209)334-5363 EM.108 <br /> On 4/12/2019 8:30 AM, Bob Buckley wrote: <br /> Good Morning Cesar, <br /> I have an update for you on behalf of Tiger Lines. An STI SPOO1 inspection is scheduled for <br /> 25Apr 19 at 9:00 - 9:30 by a certified STI Inspector. At the conclusion of the inspection, that <br /> portion of the SPCC Plan will be updated and will include a discussion about the results of the <br /> inspection and the manifold system between the two 25K-gal, diesel tanks. Once the SPCC Plan <br /> is updated with this information, I will send the plan to the PE for re-certification. Upon receipt <br /> of the re-certification, I will send you a pdf version of the plan for your review. <br /> Please feel free to get in touch if you have any questions, comments or concerns. <br /> Regards, <br /> Bob <br /> Bob Buckley <br /> Senior Compliance Specialist <br /> WGR Southwest,Inc. <br /> 11780 N.Hwy.99 <br /> Lodi,CA 95240 <br /> (209)334-5363 EM.108 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.