Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: Bob Buckley <bbuckley@wgr-sw.com> <br /> Sent: Thursday,April 25,2019 11:03 AM <br /> To: Ruvalcaba,Cesar <br /> Cc: Mark Handel <br /> Subject: Re: Tiger Lines: STI SP001 Inspection <br /> Hello Cesar, <br /> On behalf of Tiger Lines, I would like to report that the STI tank inspection for both 25K-gal,diesel tanks was <br /> completed today as planned. The certified inspector, Todd McWhorter, will prepare his report and present it to <br /> Tiger Lines when completed. The report will be included with the SPCC Plan once he sends it to me. <br /> Thank you, <br /> Bob <br /> Bob Buckley <br /> Senior Compliance Specialist <br /> WGR Southwest,Inc. <br /> 11780 N.Hwy.99 <br /> Lodi,CA 95240 <br /> (209)334-5363 EM.108 <br /> On 4/12/2019 8:30 AM, Bob Buckley wrote: <br /> Good Morning Cesar, <br /> I have an update for you on behalf of Tiger Lines. An STI SPOO1 inspection is scheduled for <br /> 25Apr 19 at 9:00 - 9:30 by a certified STI Inspector. At the conclusion of the inspection, that <br /> portion of the SPCC Plan will be updated and will include a discussion about the results of the <br /> inspection and the manifold system between the two 25K-gal, diesel tanks. Once the SPCC Plan <br /> is updated with this information, I will send the plan to the PE for re-certification. Upon receipt <br /> of the re-certification, I will send you a pdf version of the plan for your review. <br /> Please feel free to get in touch if you have any questions, comments or concerns. <br /> Regards, <br /> Bob <br /> Bob Buckley <br /> Senior Compliance Specialist <br /> WGR Southwest,Inc. <br /> 11780 N.Hwy.99 <br /> Lodi,CA 95240 <br /> (209)334-5363 EM.108 <br /> 1 <br />