My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BLACK DIAMOND
>
927
>
2800 - Aboveground Petroleum Storage Program
>
PR0515676
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2019 10:42:05 AM
Creation date
3/19/2019 4:18:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515676
PE
2832
FACILITY_ID
FA0003775
FACILITY_NAME
TIGER LINES INC
STREET_NUMBER
927
Direction
E
STREET_NAME
BLACK DIAMOND
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04903033
CURRENT_STATUS
01
SITE_LOCATION
927 E BLACK DIAMOND WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruvalcaba, Cesar <br /> From: Bob Buckley <bbuckley@wgr-sw.com> <br /> Sent: Tuesday,August 6, 2019 9:59 AM <br /> To: Ruvalcaba,Cesar <br /> Cc: Mark Handel <br /> Subject: Tiger Lines: SPCC Plan Revisions per CUPA Inspection on March 14,2019 <br /> Attachments: Tiger Lines SPCC 05Augl9.pdf <br /> Hello Cesar, <br /> Attached you will find the SPCC Plan for Tiger Lines, LLC. The SPCC Plan has been updated to reflect the <br /> corrective actions taken in response to the Notice of Violations(NOVs) presented to Tiger Lines during your <br /> inspection of the facility on March 14, 2019. Tiger Lines believes that all the violations have been corrected. <br /> Of importance,is the STI SP001 inspection performed on April 25, 2019. Please refer to Appendix F in the <br /> SPCC Plan for the details and supporting documentation of that inspection. <br /> Please review the Plan and confirm that the corrective actions taken by Tiger Lines are satisfactory and have <br /> fulfilled all the requirements of the NOV s. Upon receipt of your confirmation, the Plan will be sent to the <br /> Professional Engineer for certification. Once the Plan is certified, a copy will be sent to you for your records <br /> and a copy will be inserted into the Plan. <br /> On behalf of Tiger Lines, thank you for your patience while Tiger Lines completed the list of corrective actions. <br /> If you have any questions or comments,please contact me 209-334-5363 x 108, or Mark Handel on 209-649- <br /> 6814. <br /> Respectfully, <br /> Bob Buckley <br /> Bob Buckley <br /> Senior Compliance Specialist <br /> WGR Southwest, Inc. <br /> 11780 N. Highway 99 <br /> Lodi, CA 95240 <br /> Office: (209) 334-5363, ext. 108 <br /> Check Out WGR's Storm Water Educational Programs: <br /> FORGE - for online storm water education at affordable prices go to warsw.com/training <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.