Laserfiche WebLink
s to RECEIVEE) <br /> C Painting Solutio <br /> Spill Preventionand Response Ian JUN 0 <br /> 4 2015 <br /> Plan Management <br /> The primary contact or designee shall administer this plan and will be responsible for updating and <br /> including any required documentation. <br /> Training <br /> All personnel who may respond to any spill, need to be trained on the contents and procedures in this <br /> plan. Trained personnel will add their names and dates of training to the Training Log (see Appendix <br /> D). Only persons trained on this plan shall respond to a spill. If you are not trained and witness a spill, <br /> call or notify the primary and secondary contacts listed on Page 2 of this plan. <br /> Spill Tracking <br /> Any spills must be entered into the Spill Log (see Appendix C). If a large catastrophic spill occurs, <br /> attach additional pages to describe the event. Include known or possible causes, areas affected, and <br /> effectiveness of the cleanup. Include a review of the cleanup contractor and their procedures. For <br /> small spills, it is sufficient to fill out the Spill Log, and to take measures to prevent a repeat <br /> occurrence. <br /> Facility Inspections <br /> Routine inspections will be conducted daily during regular business hours. Daily inspections will <br /> include, at a minimum, a visual inspection of the hazardous substances containers and the area <br /> immediately adjacent to it for signs of a spill or leak. These inspections do not need to be logged <br /> unless a spill or leak is detected. Ideally, these inspections will be conducted by a manager or by <br /> regular employees. <br /> Full site inspections will be conducted monthly by the primary contact or designee and, at a minimum, <br /> will include those items on the inspection form in Appendix B. If any item on the inspection form is <br /> found unacceptable, the inspection form will be attached to this plan. If all items are deemed <br /> acceptable; it is sufficient for the inspector to log only the inspection and the results in the Inspection <br /> Log (Appendix A). <br /> Page 4 of 10 <br />