Laserfiche WebLink
1 1 I• 1's � 1 � 1 <br />• Spill Control Equipment and Decontamination Equipment are now provided. <br />• All Hazardous Waste containers are labeled. <br />• Hazardous Waste Drums are now covered. <br />• The facility Contingency Plan has been updated. <br />• Facility Supervisor has received Hazardous Waste Training. <br />• Replaced valve on Waste Water Storage Tank. Cleaned up sludge and <br />surrounding area. <br />• Training is scheduled to be provided within the next 30 days to the employees. <br />• Lid still needs to be installed on Waste Water Tank. <br />• Currently checking on EPA ID# <br />