Laserfiche WebLink
Ver. 1-L-doc-3-18-10 <br /> C <br /> Bypass Rainwater Open bypass <br /> valve inspected to be valve and Drainage <br /> Date sealed sure no oil(or reseal it activity Observations Signature of Inspector <br /> closed sheen) is visible following supervised <br /> drains e <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> Facility Name: <br /> 0 Page 18 Tier i Qualified Facility SPCC Plan <br />