My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:36:02 AM
Creation date
3/20/2019 11:10:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br />• properly anchored to the dispenser box frame or <br />dispenser island; <br />• shear section located between 1/2 inch above and <br />%2 inch below the level of the top surface of the <br />dispenser island; <br />• lever arm free to rotate and able to snap the pop- <br />pet valve shut/closed; <br />• appropriate plug properly installed in the test <br />port; <br />• no fuel flow from the dispensing nozzle when <br />the product shear valve is closed. <br />If any one of the passing criteria noted above is not <br />met, then the shear valve fails the test. <br />10.3 Vapor Shear Valves. <br />10.3.1 Purpose. The purpose of this test and <br />inspection is to verify that the vapor shear valves, <br />if present, are properly installed per manufacturer's <br />specification. <br />10.3.2 Description of Test. The vapor shear <br />valve is inspected for proper installation per the <br />manufacturer. <br />10.3.3 Preparation. Barricade the entire dis- <br />penser that is to be inspected and tested so that no <br />customers will attempt to pump fuel. Open the dis- <br />penser cover to access the inside of the dispenser. <br />10.3.4 Test Equipment. None, this is a visual <br />inspection. <br />10.3.5 Test Procedure. <br />1. Inspect the vapor shear valve for proper <br />installation and anchoring. The portion of the <br />shear valve located below the shear section <br />must be rigidly anchored to the dispenser box <br />frame or the concrete dispenser island using <br />hardware and materials specifically designed <br />for this purpose. The portion above the shear <br />section must be rigidly mounted to the inside of <br />the dispenser. If the shear valve is not properly <br />anchored, notify the appropriate person to have <br />it repaired. <br />2. Place the cover back on the dispenser and <br />remove barricades. <br />10.3.6 Pass/Fall Criteria. If a vapor shear valve <br />meets all of the following criteria, it passes the test: <br />• properly anchored to the dispenser box frame or <br />dispenser island; <br />• shear section located between 1/2 inch above and <br />1/2 inch below the level of the top surface of the <br />dispenser island. <br />If any one of the passing criteria noted above is not <br />met, then the shear valve fails the test. <br />pei.org 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.