Laserfiche WebLink
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br />APPENDICES <br />Appendix A: FRP Tank Manufacturers' Test Checklists/Data Logs............................................................ 39 <br />Appendix A-1: Containment Solutions..................................................................................................................................40 <br />AppendixA-2: Xerxes............................................................................................................................................................41 <br />Appendix B: Pressure and Vacuum Conversion Tables............................................................................... 43 <br />Table B-1: Pressure Conversions...........................................................................................................................................43 <br />Table B-2: Vacuum Conversions — inches Water Column...................................................................................................43 <br />TableB-3: Vacuum Conversions — In Hg............................................................................................................................44 <br />AppendixC: Sample Test Data Sheets..................................................................................................... 45 <br />Appendix C-1: Tank Secondary Containment Integrity Testing Dry Test Method...............................................................46 <br />Appendix C-2: Piping Secondary Containment Integrity Testing...............................................................................:.........47 <br />Appendix C-3: Spill Bucket Integrity Testing Hydrostatic Test Method Single- and <br />Double -Walled Vacuum Test Method........................................................................................................................48 <br />Appendix C-4: Containment Sump Integrity Testing Hydrostatic Testing Method..............................................................49 <br />Appendix C-5: UST Overfill Equipment Inspection Automatic Shutoff Device and Ball Float Valve................................50 <br />Appendix C-6: Overfill Alarm Operation Inspection........................................................... ...............51 <br />.................................. <br />Appendix C-7: Automatic Tank Gauge Operation Inspection...............................................................................................52 <br />Appendix C-8: Liquid Sensor Functionality Testing.............................................................................................................53 <br />Appendix C-9: Mechanical and Electronic Line Leak Detectors Performance Tests...........................................................54 <br />Appendix C-10: Shear Valve Operation Inspection...............................................................................................................55 <br />Appendix C-11: Emergency Stop Switch Operation Inspection...........................................................................................56 <br />AppendixD: Publication Reference.......................................................................................................... 57 <br />pei.org 0 <br />