Laserfiche WebLink
�m <br /> Kimberly Blackwell [EH] P12,0 13 <br /> From: Elena K. Manzo [EH] <br /> Sent: Monday, February 25, 2019 8:57 AM <br /> To: Kimberly Blackwell [EH] <br /> Cc: case@armer-norman.com <br /> Subject: RE: Safeway 2707--Permit SR0079901 Supplement <br /> Hi Case <br /> Once soil samples are collected you will be able to proceed with piping installation without waiting for sample results to <br /> come in. Hope that answers your question Elena <br /> From: Kimberly Blackwell [EH] <br /> Sent: Monday, February 25, 2019 8:53 AM <br /> To: Elena K. Manzo [EH] <br /> Subject: FW: Safeway 2707--Permit SR0079901 Supplement <br /> From: Case Gilson [mailto:case@armer-norman.com] <br /> Sent: Friday, February 22, 2019 4:40 PM <br /> To: Elena K. Manzo [EH] <emanzo@sjcehd.com>; Stacy Rivera [EH] <srivera@sjcehd.com>; Kimberly Blackwell [EH] <br /> <kblackwell@sjcehd.com>; Muniappa Naidu [EH] <Mnaidu@sjcehd.com> <br /> Subject: Re:Safeway 2707--Permit SR0079901 Supplement <br /> Please confirm that installation of the replacement piping in-situ through rock guard is not contingent upon review of <br /> the soils analysis. Because accurately tracing the line will require draining the lines, mandating agency review of lab <br /> results prior to installation of replacement pipe would mean site closure for that entire time. <br /> Regards <br /> Case Gilson <br /> 925/671-9200 Armer/Norman <br /> 925/499-1032 mobile,text is ideal <br /> case @armer-norman.com<mailto:case@armer-norman.com> <br /> On Fri, Feb 22, 2019,4:15 PM Case Gilson <case@armer-norman.com<mailto:case@armer-norman.com>>wrote: <br /> To amend/update my email below Steven Shi just called me and said his group doesn't need to be involved in this. <br /> Regards <br /> Case Gilson <br /> 925/671-9200 Armer/Norman <br /> 925/499-1032 mobile, text is ideal <br /> case @armer-norman.com<mailto:case@armer-norman.com> <br /> On Fri, Feb 22, 2019,4:10 PM Case Gilson <case@armer-norman.com<mailto:case@armer-norman.com>>wrote: <br /> Greetings SJCEHD UST Unit <br /> Kindly review attached submittal for the in-situ replacement of the 86 and 91 lines between UDC 1/2 and UDC 3/4 at <br /> Safeway Fuel Center 2707 located at 6425 N Pacific Ave in Stockton. By"in-situ"we mean replacement of the lines <br /> through the rock guard without breaking concrete. Everything you've requested in ongoing correspondence and <br /> communications on this matter is provided. Regarding the boring permit Steven She has not yet responded to our <br />