My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 4:32:18 PM
Creation date
3/20/2019 3:57:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page y of _= <br />5. SECONDARV PTPF TFgTrNr_ <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard 0 Professional Engineer <br />0 Other (Spec) <br />Test Method Used: X Pressure 0 Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br />Piping Run # 5 Piping Run # 6 Piping Run # 7 Piping Run # <br />Piping Material: 1 Fiberglass Fiberglass Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron Ameron <br />Piping Diameter: <br />3" <br />3" 3" <br />Length of Piping Run: <br />Approx. 80' <br />Approx. 60' Approx. 70' <br />Product Stored: <br />Regular 87 <br />Master Vent <br />Regular 87 Premium 91 Vent <br />Slave Vent <br />Method and location of <br />piping -run isolation: <br />Test boot at <br />Vent Box <br />Test boot at Test boot at <br />Vent Box Vent Box <br />Wait time between applying <br />pressure and starting test: <br />30 Minutes <br />30 Minutes 30 Minutes <br />Test Start Time: <br />11:20 <br />11:30 11:40 <br />Initial Reading (R,): <br />5 Psi <br />5 Psi 5 Psi <br />Test End Time: <br />12:20 <br />12:30 12:40 <br />Final Reading (RF): <br />5 Psi <br />5 Psi 5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour I Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi 0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi No Loss in Psi <br />Test Result: <br />X Pass ❑Fail <br />X Pass O Fail X Pass ❑Fail <br />Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.