My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 4:32:18 PM
Creation date
3/20/2019 3:57:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />The Red Jacket Variable Speed Flow Controller (VSFC) is only to be used with CPT or VSFC pumps P200U20-2, <br />AGP200T20-2 or P200T20-2 (Standard, Quantum or RED JACKET models). <br />The VSFC monitors pump output line pressure to ensure a constant flow to each nozzle in the fuel line, regardless <br />of the number of nozzles in use at any time. Depending on observed line pressure, the VSFC varies the pump's <br />fundamental frequency and power to increase or decrease the pump's rotational speed and hence its output <br />pressure. <br />When multiple tanks are connected to a common product line, one tank is designated the master tank and <br />additional tanks are designated as slaves. A VSFC unit is required for each tank in a multiple tank system, but only <br />the master tank requires a pressure transducer. <br />For installations that have a power conduit in the ground to the STP, and the customer does not want to bury a <br />new wiring conduit for the VSFC-to-pressure transducer cable, a Veeder-Root Intrinsically -Safe (I.S.) barrier can be <br />installed in the STP (NOTE: a one inch or larger conduit is required). The contractor can just pull a separate cable <br />through the existing power conduit to the I.S. barrier in the STP (this can be done provided conduit and seal -off <br />conductor fill requirements are met and the contractor adheres to all other aspects of the NEC or local codes). <br />The Red Jacket VSFC can be installed stand-alone or in conjunction with a TLS -350 console. If the TLS -350 <br />console also performs pressurized line leak detection, the VSFC independently controls the pump to maintain <br />desired nozzle flow rate, and operates the pump for line leak testing as directed by the console using a single <br />Pressure Transducer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.